mokena fire protection district logo graphic.5

Mokena Fire District Invests in Station Upgrades, Modernizes Security with Digital Key System

Spread the love

Article Summary: The Mokena Fire Protection District is undertaking significant technology and infrastructure upgrades, approving a new $26,025 station alerting system for Station 2 and initiating a multi-year plan to replace its aging Knox Box security system with a modern eKey platform. The board also addressed a series of vehicle repairs and station maintenance projects during its July 8 meeting.

Mokena Fire District Upgrades Key Points:

  • A new USDD Fire Station Alerting system was ordered for Station 2 at a cost of $26,025, funded through the Lincolnway Area Fire Dispatch group.

  • Chief Joe Cirelli announced a multi-year plan to upgrade the district’s 1990s-era Knox Boxes to a more secure eKey system.

  • Numerous vehicle and station repairs were reported, including a new $4,350 entry door for Station 2.

  • The Board of Trustees approved the payment of monthly bills totaling $194,081.75.

MOKENA — The Mokena Fire Protection District is investing in modernizing its equipment and facilities, ordering a new station alerting system and planning a district-wide security upgrade to replace its decades-old physical key system.

During the Board of Trustees meeting on Tuesday, Fire Chief Joe Cirelli announced the district has ordered a new USDD Fire Station Alerting system for Station 2 at a cost of $26,025. The purchase was funded using alarm monitor funds from the Lincolnway Area Fire Dispatch group. Cirelli explained the upgrade was necessary as the current “USDD Lite” version is being discontinued.

In addition to the alerting system, Cirelli detailed plans for a multi-year program to upgrade the district’s Knox Box Keysecure devices. These secure boxes provide firefighters with emergency access to buildings.

“Our current devices were purchased in the early 90’s, and the keypads have been failing,” Cirelli’s report stated. The district plans to use remaining funds to begin purchasing replacement devices and will swap out traditional key-based systems for a more modern and secure eKey system over several years.

The board also heard updates on numerous maintenance projects and repairs from Deputy Chief Rick Campbell. The north bay steel entry door and frame at Station 2 were replaced by Preferred Window and Door at a cost of $4,350.

Several vehicles also required service. Pomp’s Tire replaced both steer tires on Engine 91 and Ambulance 93 for approximately $3,142. Ambulance 92 was temporarily out of service for a faulty transmission shift cable, which was replaced by Chandler Services for about $1,030. Chandler Services is also performing diagnostic tests on Truck 92 to determine the cause of coolant consumption and is evaluating corrosion on the vehicle for potential repairs.

The board unanimously approved the payment of monthly bills totaling $194,081.75, which covered these and other operational expenses.

Latest News Stories

Chicago business activity down, unemployment rate up

Chicago business activity down, unemployment rate up

By Glenn Minnis | The Center Square contributorThe Center Square (The Center Square) – Wirepoints executive editor Mark Glennon isn’t holding back on what to make of Chicago’s stumbling economy,...
WATCH: Pritzker encourages protests; Vaccine law signed; Chicago priorities criticized

WATCH: Pritzker encourages protests; Vaccine law signed; Chicago priorities criticized

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop shares the continued...
Screenshot 2025-11-21 at 10.20.09 AM

Lincoln-Way Board Approves Tutoring Service for Hospitalized Students

Lincoln-Way Community High School District 210 Meeting | November 20, 2025 Article Summary: Lincoln-Way District 210 has entered into an agreement with LearnWell to provide tutoring services for students who are...
Events Calendar Graphic

First Look at Lincoln-Way 210’s Proposed 2026-2027 School Calendar

Lincoln-Way Community High School District 210 Meeting | November 20, 2025 Article Summary: The Lincoln-Way District 210 Board of Education reviewed a draft of the 2026-2027 school calendar, which proposes starting...
Weather-Winter

Mokena Buried Under 12.7 Inches of Snow; Sub-Zero Cold Snap Approaching Friday

Article Summary: Mokena residents are digging out from a major winter storm that dropped nearly 13 inches of snow over the weekend. The active weather pattern is forecast to continue...
Meeting Briefs

Meeting Summary and Briefs: Mokena Fire Protection District for October 14, 2025

Mokena Fire Protection District Meeting | October 14, 2025 The Mokena Fire Protection District Board of Trustees on Tuesday, October 14, 2025, celebrated the award of approximately $160,000 in federal...
Will County Board Graphic.01

Frankfort Turns to County for Wildlife & Dangerous Animal Control

Will County Board Meeting | November 2025 Article Summary: The Village of Frankfort has entered into a two-year agreement with Will County Animal Protection Services to handle calls regarding bats...
joliet junior college foundation

JJC Foundation Director Kristin Mulvey to Retire After 25 Years of Transformative Leadership

Joliet Junior College Meeting | November 12, 2025 Article Summary:Kristin Mulvey, the longtime Executive Director of Institutional Advancement and the JJC Foundation, was honored by the Board of Trustees as...
Meeting Briefs

Meeting Summary and Briefs: Mokena School District 159 for November 19, 2025

Mokena School District 159 Meeting | November 19, 2025 The Mokena School District 159 Board of Education met on November 19, 2025, where they reviewed strong state assessment scores and...
under armor logo

Lincoln-Way 210 Switches to Under Armour for Athletic Apparel

Lincoln-Way Community High School District 210 Meeting | November 20, 2025 Article Summary: The Lincoln-Way District 210 Board of Education has approved a new 3.5-year agreement with BSN and Under Armour...
Will County Logo Graphic

Crete “Group Care” Home Approved for Senior Living

Will County Board Meeting | November 2025 Article Summary: The Will County Board unanimously approved a special use permit for a senior group care home in Crete Township. The facility...
mokena fire protection district logo graphic.4

Mokena Fire District Approves Insurance Renewals With Below-Average Hikes

Mokena Fire Protection District Meeting | October 14, 2025 Article Summary: The Mokena Fire Protection District Board of Trustees unanimously approved the renewal of its health and dental insurance premiums,...
will county board graphic

New Bar Approved in Frankfort Despite Board Opposition

Will County Board Meeting | November 2025 Article Summary: The Will County Board narrowly approved a special use permit for a new bar in Frankfort Township, paving the way for...
joliet junior college logo

JJC Board Approves Grundy County Land Purchase Amid Heated Debate

Joliet Junior College Meeting | November 12, 2025 Article Summary:The Joliet Junior College Board of Trustees voted 6-2 to approve a real estate contract for a new campus in Grundy...
mokena school district 159.2

Mokena PTA Donates Over $8,000 for Student Enrichment Programs

Mokena School District 159 Meeting | November 19, 2025 Article Summary: The Mokena School District 159 Board of Education gratefully accepted a series of donations totaling $8,040 from the Mokena...