Traffic Alert: Wolf Road water repairs rescheduled for Tuesday
MOKENA – Drivers traveling through Mokena should prepare for delays on Wolf Road tomorrow, as village officials have rescheduled planned water system repairs.
The Village of Mokena announced that the infrastructure work, originally slated for Monday, has been moved to Tuesday, Feb. 3. Crews will be performing repairs on the west side of Wolf Road, specifically along the stretch between Platner Drive and the Hickory Creek Bridge.
Work is scheduled to begin at approximately 9:00 a.m. and is expected to be completed by the end of the day.
During the repair operations, one lane of traffic will be temporarily closed in the area. While traffic flow will be maintained in both directions, officials warn that drivers should expect congestion.
The Village encourages motorists to utilize alternate routes if possible. Those who must travel through the work zone are advised to exercise increased caution to ensure the safety of the construction crews.
Latest News Stories
Illinois Quick Hits: Loyola student’s alleged killer faces federal firearm charge
Will County Kicks Off Comprehensive Land Resource Management Plan Update with Focus on Proactive Zoning and Environmental Justice
Infighting and Calls for Resignation Disrupt Will County Board Meeting
Lincoln-Way 210 Awards $1.98 Million Contract for Network Cabling Upgrades
Will County Land Use Committee Splits Votes on Massive Earthrise Solar Projects Amid Intense Public Opposition
Report: Coordinated resilience infrastructure is needed in age of AI
U.S., NATO alliance on the line as Trump set to meet with Rutte
BREAKING: Trump fires Bondi, Blanche to lead DOJ
States sue Trump administration over rollback of some air pollution regulations
Energy affordability report ranks Illinois 31st, warns of ‘burdensome’ mandates
Illinois voices weigh in on birthright citizenship case
U.S. rep.: Mexico still not delivering water to South Texas, despite claims
Supporters say will storage option would streamline judicial process