Screenshot 2025-10-25 at 10.48.48 AM

New Lenox Solar Farm Proposal Advances with Conditions, Following Village and Forest Preserve Input

Spread the love

Will County Planning and Zoning Commission Meeting | October 21, 2025

Article Summary: The Will County Planning and Zoning Commission recommended approval for a 62.7-acre commercial solar energy facility in New Lenox Township, contingent on several conditions, including the development of an emergency response plan and adherence to landscaping requests from the Village of New Lenox. The project, proposed by Nexamp Solar LLC, aims to contribute to Illinois’ renewable energy goals under the Climate and Equitable Jobs Act (CEJA).

Spencer Road Solar Farm Key Points:

  • Project Scope: A special use permit was sought for a commercial solar energy facility on a 110-acre property on South Spencer Road, utilizing approximately 62.7 acres for two projects totaling 5.25 MW (AC).

  • Variances Approved: The commission also recommended variances to allow pollinator-friendly ground cover to grow up to 36 inches (from 13 inches) and to reduce the required number of mowings from five to one annually.

  • Local Input: The Village of New Lenox did not object but recommended conditions concerning setbacks, access drive surfacing, fencing, and landscape screening. The Forest Preserve District of Will County also provided recommendations to protect local wildlife.

  • State Law Compliance: The project falls under Illinois Public Law 102-1123, which sets specific parameters and timelines for counties to review commercial solar energy proposals.

JOLIET, IL – The Will County Planning and Zoning Commission on Tuesday, October 21, 2025, recommended approval for a large-scale commercial solar energy facility on approximately 62.7 acres of agricultural land in New Lenox Township. The recommendation, which now goes to the full Will County Board for a final decision, includes a special use permit and two variances aimed at promoting pollinator-friendly habitats on the site.

The project, proposed by developer Nexamp Solar LLC under the names Spencer Road Solar East LLC and Spencer Road Solar West LLC, involves constructing two adjacent solar facilities on a 110-acre property located on South Spencer Road, south of the Village of New Lenox. The combined facilities will feature approximately 12,029 solar panels on single-axis tracker systems, generating a total of 5.25 megawatts (AC).

The proposal is part of the state’s Adjustable Block program under the Climate and Equitable Jobs Act (CEJA), which incentivizes renewable energy projects. According to Illinois law, county review of such projects is subject to a strict timeline, requiring a public hearing within 60 days of a complete application.

In addition to the special use permit, the commission recommended two variances from county code. The first increases the maximum allowed height for ground cover plants from 13 inches to 36 inches. The second reduces the required number of mowings from five times per year to just once. Staff reports indicated these variances are crucial for establishing a “pollinator-friendly solar site” under the Illinois Pollinator-Friendly Solar Site Act. The taller native vegetation and reduced mowing allow deep-rooted pollinator species to propagate, which helps recharge agricultural soils, improve water infiltration, and provide habitat for birds and insects.

The Village of New Lenox, whose corporate boundary is within 400 to 1,300 feet of the property, reviewed the project and did not object. However, the village board recommended five conditions for approval. These include meeting all county setback requirements, installing a concrete or asphalt surface for the access drive within the Spencer Road right-of-way, installing an eight-foot-tall Fixed Knot Farm fence, placing landscape screening along the western fence line, and abiding by all New Lenox Fire Protection District requirements.

The Forest Preserve District of Will County also submitted a letter with recommendations to mitigate environmental impacts. The district suggested installing wildlife-friendly fencing with a six-inch gap at the bottom to allow for animal movement, clearing trees only between November 1st and March 31st to protect wildlife, and using native quality plant species for landscaping.

According to the developer, the site will be remotely monitored 24/7, with employees only visiting occasionally for maintenance. The project is expected to create 20 to 25 local jobs during its estimated six-month construction phase, anticipated to begin in the fall of 2026. The developer has also entered into an Agricultural Impact Mitigation Agreement (AIMA) with the Illinois Department of Agriculture to ensure the preservation of the agricultural land and provide financial assurance for the eventual decommissioning of the facility.

Events

No events

Leave a Comment





Latest News Stories

Will-County-Ad-Hoc-Ordinance-Review-Committee-Meeting-June-10-2025

Will County to Draft New Harassment Policy Amid Debate Over Board Authority

The Will County Ad-Hoc Ordinance Review Committee will draft a new, county-wide general harassment policy after a lengthy debate on Tuesday revealed the complexities of the county’s legal obligations and...
Will-County-Ad-Hoc-Ordinance-Review-Committee-Meeting-June-10-2025

Committee Uncovers Gaps in County Asset Tracking, Calls for Better System

A review of Will County’s fiscal policies on Tuesday highlighted significant gaps in how the county tracks its physical assets, from office furniture to squad cars, prompting calls from the...
frankfort-park-district

Frankfort Park District in Dispute with Five Oaks HOA Over Park Development Rules

The Frankfort Park District is taking legal steps to untangle itself from the development rules of the Five Oaks homeowners association, asserting that as a public body, it "cannot be...
Meeting-Briefs

In Brief: Ordinance Review Committee Actions

The Will County Ad-Hoc Ordinance Review Committee met June 10 to continue its comprehensive update of the county code. Here are some of the key actions and discussions: Court Fees...
frankfort-park-district.1

Frankfort Park District Kicks Off Busy Summer Season with Races and New Events

The Frankfort Park District is in full summer swing, with a packed schedule of programs and events that includes an expanded day camp, new community parties, and the 25th anniversary...
Mokena Logo Graphic.3

Mokena Approves FY 2026 Budget, Funds Major Infrastructure and Technology Upgrades

The Mokena Village Board unanimously adopted its Fiscal Year 2026 budget on Monday, approving a financial plan that directs major funding toward road resurfacing, storm sewer replacements, and a comprehensive...
Mokena Logo Graphic.1

Mokena Residents to See Higher Water and Sewer Bills

Residents will soon be paying more for water and sewer services after the Mokena Village Board approved rate increases for the new fiscal year. The board voted unanimously on June...
Mokena Logo Graphic.5

Mokena Renews Traffic Signal Maintenance Contract at Reduced Cost

The Village of Mokena has extended its traffic signal maintenance contract for another year, securing the service at a lower cost after the number of signals under its jurisdiction was...
Meeting-Briefs

Meeting Briefs: Mokena Village Board for June 9, 2025

The Mokena Village Board on June 9 adopted its budget for the 2026 fiscal year, a plan that includes significant spending on infrastructure and technology, and also approved utility rate...
Will-County-Jail-e1750123778582

Will County Jail Faces Major Staffing Crisis as 70 Employees Eligible to Retire by 2030

County officials warn of potential budget impact as adult detention facility grapples with unprecedented turnover Will County's adult detention facility is heading toward a staffing crisis that could significantly impact...
will-county-board.3

Will County Health Department Reports Sharp Decline in Overdose Deaths

2025 fatalities running 40% lower than previous year, officials attribute success to expanded Narcan distribution Will County is experiencing a significant reduction in overdose deaths, with 2025 fatalities running 40%...
will-county-board

Will County Health Department Faces Funding Uncertainty as Federal Grants Under Review

Multiple revenue sources threatened as department seeks legislative support for public health programs Will County Health Department officials are closely monitoring potential federal funding cuts that could impact multiple programs...

Will County Land Use Meeting Briefs

LAND USE ACTIONS Accessory Dwelling Unit Rules Modified: The committee recommended approval of text amendments allowing accessory dwelling units to exceed current building area limitations in certain circumstances. The changes...
Medicaid-logo

Federal Reconciliation Bill Targets Medicaid, SNAP Programs

Will County Legislators Briefed on Potential Local Impacts Federal legislation making sweeping cuts to Medicaid and food assistance programs could significantly impact Will County residents and services, county legislators learned...
will-county-board.2

Will County Approves Modified $756 Million Transportation Plan Despite Terminology Debate

Will County's Public Works and Transportation Committee approved a five-year, $756 million transportation improvement plan on June 3, but not before a heated debate over whether to call it a...