Major Grade Separation Projects Advance with Engineering Contracts
The committee approved two significant engineering agreements for major railroad overpass projects totaling over $4 million.
TranSystems Corporation received a $4,003,256 contract for construction engineering services on the Lorenzo Road overpass project spanning the BNSF Railroad in county board District 1. This project, funded entirely by BNSF Railway, will construct a new two-span bridge carrying Lorenzo Road over the railway, including realignment of Cottage Road and temporary construction access.
The Lorenzo Road project represents one of two major grade separations planned to reduce train-related traffic delays in the county.
A separate agreement with Burns & McDonnell for supplemental design services on the Wilmington-Peotone Road corridor was approved for $1,902,165. This covers the section from I-55 to Drecksler Road spanning county board Districts 1 and 2.
The Wilmington-Peotone Road project emerged from a comprehensive study to improve east-west connectivity in the county and reduce conflicts between vehicular and rail traffic.
Construction timelines for both projects will depend on completion of design work and right-of-way acquisition.
Latest News Stories
Costar shareholders re-elect directors, resist external pressure
Trump accuses Iran of violating ceasefire after drone attack on cargo ship
Legislature takes more measures against firms opposing redomiciling in Texas
Mistrial declared in federal Palisades Fire arson case
Ex-cops blast Chicago mayor’s new agency
Illinois Quick Hits: Chicago reports increased visitor spending
Poll: Voters give Trump worse marks on economy than job overall
Two Democrats seek GOP congressman’s seat in Colorado
WATCH: Report says more U.S. families are saving for college
Illinois to see 4 new consumer protection laws enacted
EXCLUSIVE: Report warns about costly regulations’ impact on short-term rentals
One in five calls answered on IRS identity theft line, watchdog says