The Will County Landfill Committee received a comprehensive technical update on the site investigation for the planned horizontal expansion of the county landfill, confirming the project remains on schedule. Consultants presented detailed findings from the completed geological and hydrogeological fieldwork, which will inform the final engineering and design of the new landfill area to ensure public and environmental safety.

Landfill Expansion Key Points:

  • Drilling of nine new borings and continuous soil and bedrock sampling for the expansion area is complete, with samples being sent for extensive laboratory analysis.

  • Fourteen new piezometers, or monitoring wells, have been installed to characterize groundwater conditions and will be used for an impact evaluation model.

  • Engineers are refining the expansion’s design, including adjusting the northern boundary to maximize airspace and designing a V-notched base for efficient leachate collection.

  • Despite the fieldwork phase taking slightly longer than anticipated, project consultants confirmed the overall expansion timeline has not been delayed.

The Will County Landfill Committee on Thursday received a detailed update on the extensive site investigation for the planned expansion of the county landfill, learning that the project remains on schedule as engineers begin analyzing a trove of geological data.

A consultant for the project, Mr. Fallon, walked committee members through the now-completed fieldwork phase, which involved drilling nine borings as deep as 140 feet to characterize the soil, clay, and bedrock at the proposed expansion site. He explained that the purpose of the in-depth investigation is to provide engineers with the necessary data to design a site that protects public health, safety, and welfare.

“We have logged and continuously sampled nine additional borings to supplement that information at the existing facility,” Fallon stated. “Those samples have all been delivered to the lab. And actually… we have already received back I would say about 75% of those analytical results.”

The investigation included collecting undisturbed soil samples using Shelby tubes and rock cores to conduct a battery of laboratory tests. These tests, Fallon explained, measure properties like soil density, moisture content, permeability, and shear strength. The results are critical for engineering calculations that ensure the stability of the landfill’s slopes and foundation.

In addition to soil stability, the investigation is focused on groundwater. Fourteen new piezometers—small-diameter wells—have been installed at various depths to monitor different water-bearing zones. This data will be used to create a groundwater impact evaluation model.

“We’ll take the landfill design once it’s once our engineers have developed that and then we’ll… place it into the into the geologic system,” Fallon said in response to a question from member Dawn Bullock. “And then we’ll assume that it’s leaking and we’ll evaluate… after 100 years after closure what are the what are the concentrations of this hypothetical plume at the zone of attenuation.”

Fallon noted that this modeling is a state requirement for the sighting application.

The data is already informing design tweaks. Stormwater modeling has shown that the planned retention ponds are larger than necessary, allowing engineers to push the landfill’s northern boundary slightly to “eek out a little more airspace.” They are also designing the base grades with a “V-notch design” to better channel leachate to a sump location for extraction.

County Board Speaker Joe VanDuyne asked if the water from the underlying aquifer could be utilized by the county. Fallon explained that this would be out of the question, citing both the unsuitability of the small monitoring wells for water supply and a deed restriction on the property. “We have a deed restriction we’re not allowed to use any of the water for drinking purposes,” he said.

Vice-Chair Kelly Hickey, who chaired the meeting, asked if there were any changes to the project’s timeline.

“We haven’t had a delay in the project yet,” Fallon responded. “The field investigation did take a little longer than we than we had thought it would… but within the larger framework of the project, I feel like we’re still on schedule.”

Sat Jun 13
Chance Rain Showers then Mostly Sunny
73° 51°

Chance Rain Showers then Mostly Sunny

💨 10 to 15 mph 💧 33%

Leave a Comment





Latest News Stories

Will County P&Z Logo Planning Zoning.2

Will County P&Z Grants Variances for Unpermitted Structures in Crete and Manhattan

Will County P&Z Commission Meeting | Jan. 20, 2026 Article Summary: The Planning and Zoning Commission approved variances for property owners in Crete and Manhattan who built agricultural structures without...
Will County Board Graphic.01

Meeting Summary and Briefs: Will County Landfill Committee for Jan. 13, 2026

Will County Landfill Committee Meeting | Jan. 13, 2026 The Will County Board Landfill Committee met on Tuesday, January 13, 2026, to address operational improvements at the Prairie View Landfill...
Scam Alert Grahpic

Monee Police warn residents of phone scammers impersonating officers

MONEE, Ill. – The Monee Police Department issued a community alert this week regarding a resurgence of telephone scams in which fraudsters are impersonating police officers to solicit money from residents....
Will County P&Z Logo Planning Zoning

Will County P&Z Approves Mokena Scrap Drop-Off Despite Municipal Objections

Will County P&Z Commission Meeting | Jan. 20, 2026 Article Summary: The Will County Planning and Zoning Commission granted a special use permit for an outdoor recyclable material drop-off facility...
solar panels photovoltaics in solar farm

Will County Braces for 6,000-Acre Solar Project; Prepare for ‘Massive’ Solar Hearings

Will County P&Z Commission Meeting | Jan. 20, 2026 Will County Braces for 6,000-Acre Solar Project; Commissioners Weigh Conflicts and Crowds Article Summary:The Will County Planning and Zoning Commission is...
Will County Board Graphic.04

Meeting Summary and Briefs: Will County Board for January 15, 2026

Will County Board Meeting | January 15, 2026 Meeting SummaryThe Will County Board met on January 15, 2026, to tackle a heavy agenda focused on infrastructure investment, legislative policy, and...
Police Crime

Pursuit following railroad theft ends in New Lenox; one suspect at large

NEW LENOX, Ill. – A reported cargo theft in Wilmington Township sparked a multi-jurisdictional pursuit Saturday morning that ended with a crash and a manhunt in a New Lenox neighborhood. The...
Will County Board Graphic.04

Waste Management Commits to Expanded Litter Patrols Around Landfill

Will County Landfill Committee Meeting | Jan. 13, 2026 Article Summary: Following complaints from county officials, Waste Management has agreed to significantly expand its litter collection efforts along roadways surrounding...
Meeting Briefs

Meeting Summary and Briefs: Mokena School District 159 for January 21, 2026

Mokena School District 159 Meeting | January 21, 2026 Overall Meeting SummaryThe Mokena School District 159 Board of Education met on Wednesday, January 21, 2026, addressing a mix of student...
Meeting Briefs

Meeting Summary and Briefs: Will County Ad-Hoc Ordinance Review Committee for Jan. 13, 2026

Will County Ad-Hoc Ordinance Review Committee Meeting | Jan. 13, 2026 The Will County Board Ad-Hoc Ordinance Review Committee met on Tuesday, January 13, 2026, to continue its comprehensive update...
Will County Board Graphic.01

County Approves $22 Million in Road Projects for Lorenzo Road and Mills Road

Will County Board Meeting | January 15, 2026 Article Summary: The Will County Board approved major infrastructure contracts, including an $18.8 million bridge replacement on Lorenzo Road and a $3.2...
Will County Board Graphic.03

Landfill Committee Advances Plan to Purchase Fourth Compressor for RNG Plant

Will County Landfill Committee Meeting | Jan. 13, 2026 Article Summary: The Landfill Committee voted to move forward with engineering estimates for a fourth compressor at the Prairie View Renewable...
mokena school district 159.5

Fifth Graders Honored for DARE Essays on Decision Making

Mokena School District 159 Meeting | January 21, 2026 Article Summary: Two fifth-grade students were spotlighted at the Mokena School District 159 Board meeting for their winning essays on the...
Will County Board Graphic.03

Ad-Hoc Committee Retains Noise Ordinance Despite Enforcement Frustrations

Will County Ad-Hoc Ordinance Review Committee Meeting | Jan. 13, 2026 Article Summary: The Ad-Hoc Ordinance Review Committee voted to retain the county’s public nuisance noise ordinance despite members describing...
Will County Board Graphic.03

Will County Commits $15M to Transfer Sanitary District Operations to City of Joliet

Will County Board Meeting | January 15, 2026 Article Summary: The Will County Board has authorized an intergovernmental agreement to dissolve the Southeast Joliet Sanitary District and transfer its water...