Mokena Logo Graphic.5

Mokena Board Approves Final Plat for 50-Home Boulder Ridge Phase IV Subdivision

Spread the love

Mokena Village Board Meeting | September 15, 2025

Article Summary: The Mokena Village Board approved the final plat for the 50-lot fourth phase of the Boulder Ridge subdivision, clearing the way for construction to begin on single-family homes near 187th Street and Townline Road. The project also includes significant road improvements and a bridge repair that will require a temporary closure of Townline Road in 2025.

Boulder Ridge Phase IV Key Points:

  • The final plat includes 50 new single-family home lots on property located at 18950 Townline Road.

  • The developer, Sycamore Development LLC, is required to widen Townline Road and repair an existing bridge over Marley Creek.

  • The road and bridge work will necessitate a closure of Townline Road from approximately May 2025 through September 2025.

  • Final completion of the subdivision, including road paving, is targeted for the fall of 2026.

The Mokena Village Board on Monday, September 15, 2025, unanimously approved the final plat for the fourth phase of the Boulder Ridge subdivision, paving the way for the construction of 50 new single-family homes.

The development, led by Sycamore Development LLC, is located at 18950 Townline Road and has been in various planning stages since the property was annexed and zoned for single-family residential (R-4) use in 2003. The board had previously approved a preliminary plat for 51 lots in 2021.

Assistant Village Administrator Brent Cann presented the project update, noting that the final plat is in “substantial conformance” with the previously approved plans. A key component of the project involves significant off-site infrastructure work. Per the annexation agreement, the developer is required to widen Townline Road and construct a pedestrian bridge over Marley Creek. The developer has also agreed to make repairs to the existing vehicle bridge.

This roadwork will cause a significant, albeit temporary, disruption for local drivers. According to the developer’s timeline, the work on Townline Road and the bridge closure is scheduled to take place from May 2025 through September 2025.

During the development process, operational issues such as mud-tracking onto Townline Road and 187th Street have resulted in complaints from neighboring Frankfort and New Lenox Townships, as well as the Will County Highway Department. Cann noted that the sequencing of the off-site work and the bridge closure will need to be carefully coordinated. To prevent disruption to nearby residents, construction traffic will be prohibited from entering the new development through the existing Whisper Creek subdivision.

The developer’s projected timeline aims for site grading to occur from September 2025 through June 2026, with road paving completed and the full subdivision finished by the fall of 2026. The board’s approval was contingent on updated Letters of Credit, which have been provided. The final plat must now be officially recorded by the developer.

Leave a Comment





Latest News Stories

Frankfort-Village-Board-Meeting-Graphic

Frankfort Village Board Adopts $59.4 Million Appropriation for Fiscal Year 2026

The Frankfort Village Board has formally set its maximum legal spending limit for the upcoming fiscal year, adopting a $59,366,900 appropriation ordinance for fiscal year 2026. The measure was passed...
Mokena Logo Graphic.6

Mokena Awards $472K Contract for Countryview Estates Storm Sewer Project

The Village of Mokena is moving forward with a major infrastructure project, awarding a contract worth over $472,000 to a local company for the Countryview Estates Storm Sewer Replacement Project....
Frankfort-Village-Board-Meeting-Graphic

Frankfort Establishes New Zoning Rules to Attract Data Centers

The Village of Frankfort has amended its zoning ordinance to create a specific use category for data centers, a move designed to regulate and attract high-tech development. The Village Board...
Champaign-based Pavlov

Fiber Internet Provider Pavlov Media Details Plans to Expand into Mokena

Mokena residents may soon have another choice for high-speed internet service, as Champaign-based Pavlov Media has announced its intent to build a fiber optic network throughout the village. Mark Sheldon,...
Frankfort-Village-Board-Meeting-Graphic

Currie Motors Expansion Gets Approval with Site Modifications

Currie Motors on Lincoln Highway received approval from the Frankfort Village Board on Monday for a major change to its site plan, allowing for the construction of seven new parking...
Mokena Logo Graphic.1

Mokena Celebrates Successful July 4th Events, Honors Parade Winners

A celebratory atmosphere filled the Mokena Village Board meeting on July 14, as officials and community leaders recounted the success of the village's Independence Day festivities and honored the winners...
Frankfort-Village-Board-Meeting-Graphic

Frankfort Approves $134,531 Maintenance Contract for Wastewater Plant Filters

The Frankfort Village Board has approved a $134,531.17 agreement with Veolia Water Technologies, Inc. for critical preventative maintenance at the Regional Wastewater Treatment Plant. The contract is for the complete...
Meeting-Briefs

Meeting Briefs: Mokena Village Board for July 14, 2025

The Mokena Village Board on July 14 approved a major overhaul of its zoning code, awarded a contract for a significant storm sewer project, and heard plans for a new...
Frankfort-Village-Board-Meeting-Graphic

Meeting Briefs: Frankfort Village Board for July 14, 2025

'Whisk & Flame' Culinary Studio Approved: The board approved "Whisk & Flame," an experiential culinary studio, for 10-12 Elwood Street. The project includes four special use permits for entertainment, liquor sales,...
WCO-Exec-Cmte-July-10.1

County Approves School Resource Officer, Multi-Year Planning Requirements

Will County approved hiring an additional sheriff's deputy for a school resource officer position that will be fully funded by Summit Hill School District 161, while also passing new transparency...
WCO-Exec-Cmte-July-10.2

County Addresses Senior Tax Exemption Processing Error

A processing error that cost County Board member Julie Berkowicz $600 in senior tax exemptions has prompted discussions about improving verification systems for property tax breaks. Will County Chief Assessment...
Meeting-Briefs

Executive Committee Meeting July 10 Meeting Briefs

Liquor License Expansion: The county approved increasing Class C1 liquor licenses from eight to nine to accommodate Lockport Gas and Food LLC at 14747 W. 159th Street in Homer Glen....
frankfort-park-district

Meeting Briefs: Frankfort Park District Board for June 10, 2025

The Frankfort Park District Board of Commissioners discussed a legal dispute with the Five Oaks homeowners association over park development rules at its Tuesday meeting. Executive Director Gina Hassett reported...
Will-County-Land-Use-July-3.1

Committee Rejects Troy Township Solar Projects Amid Strong Local Opposition

The Will County Land Use and Development Committee recommended denial for two controversial commercial solar energy projects in Troy Township on Thursday, following a wave of opposition from local municipalities,...
Will-County-Land-Use-July3.2

Controversial DuPage Township Rezoning for Outdoor Storage Advances

A contentious proposal to rezone a 20-acre parcel in DuPage Township from agricultural (A-1) to heavy industrial (I-3) for an outdoor vehicle storage facility narrowly passed the Will County Land...