Mokena Logo Graphic.5

Mokena Board Approves Final Plat for 50-Home Boulder Ridge Phase IV Subdivision

Spread the love

Mokena Village Board Meeting | September 15, 2025

Article Summary: The Mokena Village Board approved the final plat for the 50-lot fourth phase of the Boulder Ridge subdivision, clearing the way for construction to begin on single-family homes near 187th Street and Townline Road. The project also includes significant road improvements and a bridge repair that will require a temporary closure of Townline Road in 2025.

Boulder Ridge Phase IV Key Points:

  • The final plat includes 50 new single-family home lots on property located at 18950 Townline Road.

  • The developer, Sycamore Development LLC, is required to widen Townline Road and repair an existing bridge over Marley Creek.

  • The road and bridge work will necessitate a closure of Townline Road from approximately May 2025 through September 2025.

  • Final completion of the subdivision, including road paving, is targeted for the fall of 2026.

The Mokena Village Board on Monday, September 15, 2025, unanimously approved the final plat for the fourth phase of the Boulder Ridge subdivision, paving the way for the construction of 50 new single-family homes.

The development, led by Sycamore Development LLC, is located at 18950 Townline Road and has been in various planning stages since the property was annexed and zoned for single-family residential (R-4) use in 2003. The board had previously approved a preliminary plat for 51 lots in 2021.

Assistant Village Administrator Brent Cann presented the project update, noting that the final plat is in “substantial conformance” with the previously approved plans. A key component of the project involves significant off-site infrastructure work. Per the annexation agreement, the developer is required to widen Townline Road and construct a pedestrian bridge over Marley Creek. The developer has also agreed to make repairs to the existing vehicle bridge.

This roadwork will cause a significant, albeit temporary, disruption for local drivers. According to the developer’s timeline, the work on Townline Road and the bridge closure is scheduled to take place from May 2025 through September 2025.

During the development process, operational issues such as mud-tracking onto Townline Road and 187th Street have resulted in complaints from neighboring Frankfort and New Lenox Townships, as well as the Will County Highway Department. Cann noted that the sequencing of the off-site work and the bridge closure will need to be carefully coordinated. To prevent disruption to nearby residents, construction traffic will be prohibited from entering the new development through the existing Whisper Creek subdivision.

The developer’s projected timeline aims for site grading to occur from September 2025 through June 2026, with road paving completed and the full subdivision finished by the fall of 2026. The board’s approval was contingent on updated Letters of Credit, which have been provided. The final plat must now be officially recorded by the developer.

Leave a Comment





Latest News Stories

Mokena Logo Graphic.1

Mokena Residents to See Higher Water and Sewer Bills

Residents will soon be paying more for water and sewer services after the Mokena Village Board approved rate increases for the new fiscal year. The board voted unanimously on June...
Mokena Logo Graphic.5

Mokena Renews Traffic Signal Maintenance Contract at Reduced Cost

The Village of Mokena has extended its traffic signal maintenance contract for another year, securing the service at a lower cost after the number of signals under its jurisdiction was...
Meeting-Briefs

Meeting Briefs: Mokena Village Board for June 9, 2025

The Mokena Village Board on June 9 adopted its budget for the 2026 fiscal year, a plan that includes significant spending on infrastructure and technology, and also approved utility rate...
Will-County-Jail-e1750123778582

Will County Jail Faces Major Staffing Crisis as 70 Employees Eligible to Retire by 2030

County officials warn of potential budget impact as adult detention facility grapples with unprecedented turnover Will County's adult detention facility is heading toward a staffing crisis that could significantly impact...
will-county-board.3

Will County Health Department Reports Sharp Decline in Overdose Deaths

2025 fatalities running 40% lower than previous year, officials attribute success to expanded Narcan distribution Will County is experiencing a significant reduction in overdose deaths, with 2025 fatalities running 40%...
will-county-board

Will County Health Department Faces Funding Uncertainty as Federal Grants Under Review

Multiple revenue sources threatened as department seeks legislative support for public health programs Will County Health Department officials are closely monitoring potential federal funding cuts that could impact multiple programs...

Will County Land Use Meeting Briefs

LAND USE ACTIONS Accessory Dwelling Unit Rules Modified: The committee recommended approval of text amendments allowing accessory dwelling units to exceed current building area limitations in certain circumstances. The changes...
Medicaid-logo

Federal Reconciliation Bill Targets Medicaid, SNAP Programs

Will County Legislators Briefed on Potential Local Impacts Federal legislation making sweeping cuts to Medicaid and food assistance programs could significantly impact Will County residents and services, county legislators learned...
will-county-board.2

Will County Approves Modified $756 Million Transportation Plan Despite Terminology Debate

Will County's Public Works and Transportation Committee approved a five-year, $756 million transportation improvement plan on June 3, but not before a heated debate over whether to call it a...
will-county-board.3

Will County completes major projects while others move forward

Will County's facilities team has completed several major projects while advancing others throughout the county, officials reported during a Capital Improvements & IT Committee meeting Monday. The Old Courthouse Plaza...
will-county-board.3

Will County Accepts $140,000 Developer Donation for Road Improvements

Will County's Public Works and Transportation Committee accepted a $140,143.90 donation from a developer in lieu of constructing traffic improvements along Laraway Road. The donation comes from the Lakes Park...
will-county-board.2

State Legislative Session Wrap-Up Shows Mixed Results

Will County's state legislative priorities saw mixed results as the Illinois General Assembly concluded its spring session on May 31, with several key bills advancing while others stalled. The Legislative...
will-county-board.2

Will County expands safety initiatives across facilities

Will County has implemented new safety protocols and training programs across its facilities, including the selection of department safety monitors and participation in community health education events. Each county department...
will-county-board.3

Leglislative Committee Meeting Briefs

Federal Grant Deadline Extended: The Surface Transportation Reauthorization deadline has been extended to May 30 for policy submissions, with both House and Senate committees actively seeking stakeholder input ahead of...
will-county-board.3

Speed Limits Reduced on Two Township Roads

The committee approved new speed zones for two township roads based on engineering studies showing current limits exceed safe driving speeds. Offner Road in Green Garden Township will have a...