Screenshot 2025-10-25 at 10.48.48 AM

New Lenox Solar Farm Proposal Advances with Conditions, Following Village and Forest Preserve Input

Spread the love

Will County Planning and Zoning Commission Meeting | October 21, 2025

Article Summary: The Will County Planning and Zoning Commission recommended approval for a 62.7-acre commercial solar energy facility in New Lenox Township, contingent on several conditions, including the development of an emergency response plan and adherence to landscaping requests from the Village of New Lenox. The project, proposed by Nexamp Solar LLC, aims to contribute to Illinois’ renewable energy goals under the Climate and Equitable Jobs Act (CEJA).

Spencer Road Solar Farm Key Points:

  • Project Scope: A special use permit was sought for a commercial solar energy facility on a 110-acre property on South Spencer Road, utilizing approximately 62.7 acres for two projects totaling 5.25 MW (AC).

  • Variances Approved: The commission also recommended variances to allow pollinator-friendly ground cover to grow up to 36 inches (from 13 inches) and to reduce the required number of mowings from five to one annually.

  • Local Input: The Village of New Lenox did not object but recommended conditions concerning setbacks, access drive surfacing, fencing, and landscape screening. The Forest Preserve District of Will County also provided recommendations to protect local wildlife.

  • State Law Compliance: The project falls under Illinois Public Law 102-1123, which sets specific parameters and timelines for counties to review commercial solar energy proposals.

JOLIET, IL – The Will County Planning and Zoning Commission on Tuesday, October 21, 2025, recommended approval for a large-scale commercial solar energy facility on approximately 62.7 acres of agricultural land in New Lenox Township. The recommendation, which now goes to the full Will County Board for a final decision, includes a special use permit and two variances aimed at promoting pollinator-friendly habitats on the site.

The project, proposed by developer Nexamp Solar LLC under the names Spencer Road Solar East LLC and Spencer Road Solar West LLC, involves constructing two adjacent solar facilities on a 110-acre property located on South Spencer Road, south of the Village of New Lenox. The combined facilities will feature approximately 12,029 solar panels on single-axis tracker systems, generating a total of 5.25 megawatts (AC).

The proposal is part of the state’s Adjustable Block program under the Climate and Equitable Jobs Act (CEJA), which incentivizes renewable energy projects. According to Illinois law, county review of such projects is subject to a strict timeline, requiring a public hearing within 60 days of a complete application.

In addition to the special use permit, the commission recommended two variances from county code. The first increases the maximum allowed height for ground cover plants from 13 inches to 36 inches. The second reduces the required number of mowings from five times per year to just once. Staff reports indicated these variances are crucial for establishing a “pollinator-friendly solar site” under the Illinois Pollinator-Friendly Solar Site Act. The taller native vegetation and reduced mowing allow deep-rooted pollinator species to propagate, which helps recharge agricultural soils, improve water infiltration, and provide habitat for birds and insects.

The Village of New Lenox, whose corporate boundary is within 400 to 1,300 feet of the property, reviewed the project and did not object. However, the village board recommended five conditions for approval. These include meeting all county setback requirements, installing a concrete or asphalt surface for the access drive within the Spencer Road right-of-way, installing an eight-foot-tall Fixed Knot Farm fence, placing landscape screening along the western fence line, and abiding by all New Lenox Fire Protection District requirements.

The Forest Preserve District of Will County also submitted a letter with recommendations to mitigate environmental impacts. The district suggested installing wildlife-friendly fencing with a six-inch gap at the bottom to allow for animal movement, clearing trees only between November 1st and March 31st to protect wildlife, and using native quality plant species for landscaping.

According to the developer, the site will be remotely monitored 24/7, with employees only visiting occasionally for maintenance. The project is expected to create 20 to 25 local jobs during its estimated six-month construction phase, anticipated to begin in the fall of 2026. The developer has also entered into an Agricultural Impact Mitigation Agreement (AIMA) with the Illinois Department of Agriculture to ensure the preservation of the agricultural land and provide financial assurance for the eventual decommissioning of the facility.

Leave a Comment





Latest News Stories

Pritzker disagrees with Durbin on vote to end shutdown

Pritzker disagrees with Durbin on vote to end shutdown

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Gov. J.B. Pritzker says he is disappointed that Illinois U.S. Sen. Dick Durbin voted in favor of...
Pritzker open to conversation with Trump on alderman’s immigration proposal

Pritzker open to conversation with Trump on alderman’s immigration proposal

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – A letter from a Chicago alderman to President Donald Trump could lead to conversation with Illinois Gov....
Meeting Briefs

Meeting Summary and Briefs: Mokena Community Public Library District Board of Trustees for September 2025

Mokena Community Public Library District Board of Trustees Meeting | September 2025 The Mokena Community Public Library District Board of Trustees centered its September 23 meeting on key financial planning,...
Meeting Briefs

Meeting Summary and Briefs: Village of Mokena Board of Trustees for October 27, 2025

Village of Mokena Board of Trustees Meeting | October 27, 2025 The Mokena Village Board took major action on finances and public safety during its meeting on Monday, October 27,...
Meeting-Briefs

Meeting Summary and Briefs: Mokena Fire Protection District for September 2025

Mokena Fire Protection District Meeting | September 2025 The Mokena Fire Protection District Board of Trustees on Tuesday, September 9, 2025, made a major financial decision regarding its emergency fleet,...
Meeting Briefs

Meeting Summary and Briefs: Will County Public Works & Transportation Committee for November 2025

Will County Public Works & Transportation Committee Meeting | November 2025 The Will County Public Works & Transportation Committee on Tuesday approved a landmark agreement to consolidate the Central Will...
Screenshot 2025-11-06 at 3.37.39 PM

Will County Committee Members Debate Future Capital Priorities, Clash on Borrowing

Will County Capital Improvements & IT Committee Meeting | November 4, 2025 Article Summary: After learning Will County could borrow over $100 million for new projects, members of the Capital Improvements...
Meeting Briefs

Meeting Summary and Briefs: Will County Planning and Zoning Commission for November 4, 2025

Will County Planning and Zoning Commission Meeting | November 4, 2025 The Will County Planning and Zoning Commission on Tuesday, November 4, 2025, considered a series of homeowner requests for...
Meeting Briefs

Meeting Summary and Briefs: Will County Legislative Committee for November 4, 2025

Meeting Summary and Briefs: Will County Legislative Committee for November 4, 2025 The Will County Legislative Committee met on Tuesday, November 4, 2025, to continue developing its 2026 state and...
Screenshot 2025-11-05 at 4.18.41 PM

Will County Saves $5.7 Million in Bond Refinancing, Maintains High Credit Ratings

Will County Finance Committee Meeting | November 2025 Article Summary: A recent bond transaction successfully saved Will County over $5.7 million in future debt payments, while a presentation from the...
concrete patching

Mokena Approves Additional $30,000 for Concrete Pavement Patching

Village of Mokena Board of Trustees Meeting | October 27, 2025 Article Summary: The Mokena Village Board authorized an additional $30,000 for its fiscal year 2026 concrete patching program, bringing...
Joliet-Junior-college.-Graphic-Logo.3

Meeting Summary and Briefs: Joliet Junior College Board of Trustees for October 2025

Joliet Junior College Board of Trustees Meeting | October 15, 2025 The Joliet Junior College Board of Trustees took major steps on two significant, long-term projects during its October 15...
mokena library logo graphic.8

Library Board Approves Annual Transfer to Special Reserve Fund

Mokena Community Public Library District Board of Trustees Meeting | September 2025 Article SummaryThe Mokena Community Public Library District Board of Trustees has approved its annual transfer of funds into...
Mokena Logo Graphic.6

Board Approves Permit to Rebuild Historic Barn on Schoolhouse Road

Village of Mokena Board of Trustees Meeting | October 27, 2025 Article Summary: The Mokena Village Board approved a special use permit for resident George Pasztelan to rebuild a historic...
mokena fire protection district logo graphic.2

Mokena and Tinley Park Fire Departments Renew 5-Year Fleet Maintenance Agreement

Mokena Fire Protection District Meeting | September 2025 Article Summary: The Mokena Fire Protection District will continue its partnership with the Tinley Park Fire Department for vehicle maintenance after its Board...