County Approves $1.9 Million for Wilmington-Peotone Road Engineering
Will County Board Meeting | February 19, 2026
Article Summary: The Will County Board authorized nearly $2 million in Motor Fuel Tax funds to begin Phase I design engineering for improvements to Wilmington-Peotone Road.
Wilmington-Peotone Road Key Points:
-
Project Limit: Wilmington-Peotone Road (CH 25) from U.S. Route 45/52 to Center Road (CH 19).
-
Cost: $1,989,737.00.
-
Funding Source: County Motor Fuel Tax (MFT) allotment.
-
Contractor: Alfred Benesch and Company (Chicago).
The Will County Board took a significant step toward upgrading a key corridor in District 2 on Thursday, approving a $1.98 million expenditure for design engineering on Wilmington-Peotone Road.
The resolution allocates $1,989,737 in Motor Fuel Tax (MFT) funds to cover Phase I engineering services for the stretch of road between U.S. Route 45/52 and Center Road.
The board awarded the contract for these design services to Alfred Benesch and Company. Phase I engineering typically involves environmental studies, preliminary design, and determining the scope of necessary improvements before construction plans are finalized.
This project is part of the county’s broader Transportation Improvement Program. According to the county’s 2026 Federal Legislative Agenda, which was also discussed during the meeting, the Will County Division of Transportation is performing a Planning and Environmental Linkages (PEL) study on approximately 22 miles of the Wilmington-Peotone corridor to address “new freight clusters” that have appeared in the area.
The expenditure was passed as part of the public works consent agenda.
Latest News Stories
Pritzker: Chicago mayor ‘never once called’ to oppose pension bill
WATCH: Illinois In Focus Daily | Thursday Aug. 7th, 2025
Illinois quick hits: Cook County declares flood disaster; opt-out forms promoted; State Fair begins
WATCH: IL Republican pushes for TX quorum rules that Pritzker hails as ‘hero’ move
Mokena School District Terminates Contract with Evans and Sons Blacktop Over Project Deficiencies
Mokena District 159 Highlights Strategic Progress, Sets Sights on Advanced Learning and Data Systems
District 159 Approves $173,700 Window Shade Replacement Project for Summer 2026
Mokena Junior High to Get New Hot Water Heaters After Failures
District 159 Board Gets First Look at FY26 Budget Draft, Education Fund Deficit Noted
Meeting Summary: Mokena School District 159 Board for July 16, 2025
Meeting Summary and Briefs: Frankfort Township Board for June 9, 2025
Sanchez Family Unveils Major Redevelopment Plan for Monee Industrial Property