Will County Board Graphic.04

Will County Lowers Cedar Road Speed Limit Amid Debate Over Curve Safety and Fatalities

Spread the love

Will County Public Works & Transportation Committee Meeting | April 7, 2026

Article Summary: The Will County Public Works and Transportation Committee approved lowering a segment of Cedar Road to 45 mph, sparking a debate over the effectiveness of speed limits, driver compliance, and the context of recent fatal accidents near the road’s infamous S-curve.

Cedar Road Speed Limit Key Points:

  • A 0.43-mile segment of Cedar Road (Summerfield Drive to US Route 6) will drop from 50 mph to 45 mph.

  • The adjacent 0.57-mile segment (Chicago-Bloomington Trail to Summerfield Drive), which includes the S-curve, will remain at 50 mph.

  • County Engineer Jeff Ronaldson clarified that of the four fatalities on the corridor since 2017, the two oldest were alcohol-related, and the two most recent did not occur at the curves.

  • Board members expressed ongoing anxiety regarding the roadway’s configuration, with some suggesting flashing LED stop signs for intersecting streets.

The Will County Board Public Works & Transportation Committee on Tuesday, April 7, 2026, approved speed limit alterations along Cedar Road (County Highway 4), a decision that prompted a detailed discussion about a notorious S-curve, recent fatal accidents, and the limits of engineering to correct driver behavior.

The committee reviewed a comprehensive speed study for the corridor spanning from US Route 6 to the Chicago-Bloomington Trail in New Lenox and Homer Townships. Based on the data, the committee passed an ordinance to establish Zone 548, dropping the speed limit from 50 mph to 45 mph on the southernmost 0.43-mile segment from Summerfield Drive to US Route 6.

However, the adjacent 0.57-mile stretch containing the S-curve—designated as Zone 713 from the Chicago-Bloomington Trail to Summerfield Drive—did not warrant a reduction based on the engineering study, and will remain at 50 mph.

“We did speed studies along the whole corridor, and none of the other segments warranted a lowering of the speed limit,” County Engineer Jeff Ronaldson told the committee. He noted that the southern segment justifies the 45 mph limit due to the density of homes and businesses closer to Route 6.

Board Member David G. Oxley (R-Lockport) questioned the safety of maintaining the 50 mph speed limit directly exiting the S-curve, noting the presence of immediate curb cuts, forest preserve access, and new residential driveways. Board Member Mark V. Revis (R-Plainfield) pressed Ronaldson on whether the Board had the authority to override the engineering data and lower the speed limit anyway based on community concern.

Ronaldson confirmed that state statute does allow the Board to lower the limit independently, but he cautioned against it. Will County Board Speaker Joe VanDuyne (D-Wilmington) added his perspective from years on the committee.

“When you do a speed study, it actually is contradictive because it shows the comfortability of the drivers, of how fast they feel safe,” VanDuyne said. “To actually lower the speed limit… you could cause a worse problem.”

Ronaldson agreed, noting that artificially low speed limits often frustrate drivers, leading to aggressive passing maneuvers.

The debate also touched on the tragic history of the corridor, which was noted to have suffered four fatalities in recent years. Ronaldson provided critical context to those statistics.

“The oldest one, four, five, six years ago, fatality 2017, was alcohol and speed related. 2020, also alcohol related,” Ronaldson explained. “The two newest ones, ’23 and ’25, they’re both under investigation so I can’t go into details, but neither one of those were at these curves… To say it’s just this curve is not quite accurate.”

Ronaldson emphasized that the county has already exceeded standard safety requirements on the curve, installing extensive advisory speed plates and highly visible black-and-yellow chevron signs.

Despite the data, Board Member Steve Balich (R-Homer Glen) voiced the ongoing anxiety shared by many residents who navigate the area.

“I could just tell you every time I go over in that area, I’m a nervous wreck because you don’t know which direction the cars are going to come from,” Balich said. “There’s too many streets connecting to that S-curve… but if you lower the speed limit, they’re still going to go the speed that they go. That ain’t going to change. But whether or not they stop like they’re supposed to, that’s where the problem is.”

Board Member Kelly Hickey (D-Naperville) suggested exploring stop signs equipped with flashing LED borders for the intersecting streets to grab drivers’ attention. Ronaldson noted that the county has utilized flashing beacons on top of signs in the past, but “still people will go through those. So, I don’t know if that would really make a difference. It’s more people not following the law, and it doesn’t really matter what we do to some extent.”

The ordinances to officially alter the speed zones were passed unanimously and will advance to the full County Board for final approval.

⚠️ Special Weather Statement issued June 4 at 4:25AM CDT by NWS Chicago IL
Today Jun 3
Mostly Sunny
87° 66°

Mostly Sunny

💨 5 to 15 mph 💧 0%

Leave a Comment





Latest News Stories

Will-County-Public-Works-Transportation-Committee-Meeting-July-1-2025

County Board Approves 2026-2031 Transportation Plan Despite Project Opposition

Will County board members approved a contested five-year transportation improvement plan Tuesday after heated debate over a controversial Homer Glen road project that has drawn sustained community opposition. The Will...
Will-County-Planning-and-Zoning-Commission-Meeting-July-1-2025

Contentious I-3 Rezoning for DuPage Township Storage Yard Narrowly Advances

A proposal to rezone a 20-acre parcel in DuPage Township from agricultural to the county's most intensive industrial classification narrowly earned a recommendation for approval from the Will County Planning...
Meeting-Briefs

Will County Legislative Committee July 1 Meeting Briefs

Federal Budget Impact: Will County could face significant funding challenges if federal budget reconciliation measures reduce Medicaid and SNAP benefits. The county health department and social services rely heavily on...
Will-County-Finance-Committee-Meeting-July-1-2025

County Moves Forward with $200.8 Million Bond Refinancing Plan

Will County Finance Committee members on July 1 approved moving forward with a comprehensive bond refinancing ordinance that could save taxpayers more than $716,000 over the life of the bonds...
Will-County-Public-Works-Transportation-Committee-Meeting-July-1-2025

Access Will County Dial-a-Ride Program Sees Record Growth, Eyes Expansion

Will County's dial-a-ride transportation service for seniors and disabled residents reached record ridership levels while officials plan major expansion to cover all county townships. The Access Will County program served...
Will-County-Capital-Improvements-IT-Committee-Meeting-July-1-2025

Will County to Launch New Public Meeting Agenda System in August Amidst Data Conversion Concerns

Will County is set to launch its new public meeting agenda and records software, Granicus “OneMeeting,” in August, but the transition will see over a decade of historical records converted...
Will-County-Planning-and-Zoning-Commission-Meeting-July-1-2025

Green Garden Township Poised for First Major Subdivision in Years After Rezoning

The Will County Planning and Zoning Commission has recommended a rezoning that could pave the way for the first major residential subdivision in Green Garden Township in nearly two decades....
Will-County-Finance-Committee-Meeting-July-1-2025

County RNG Facility Shows Strong Performance Despite Solar Challenges

Will County's Renewable Natural Gas facility is exceeding production targets while officials explore options to reduce substantial electricity costs that currently impact profitability. Project manager Greg Komperda told Finance Committee...
Meeting-Briefs

PZC Briefs: Solar Farm in Crete, Post-Fire Permit for Troy Business, and More

The Will County Planning and Zoning Commission handled several other cases during its July 1 meeting, including a new solar farm, a temporary permit for a fire-damaged business, and routine...
Meeting-Briefs

In Brief: Capital & IT News

Here are other highlights from the Will County Capital Improvements & IT Committee meeting on Tuesday. Successful Fire Drill at County BuildingThe Will County Office Building held its first full...
Meeting-Briefs

Will County Finance Committee July 1 Meeting Briefs

Bond Refinancing Advances: Finance Committee approved an ordinance authorizing up to $200.8 million in bond refinancing that could save taxpayers more than $716,000. The measure moves to the full County...
Meeting-Briefs

Will County Public Works Committee Juliy 1 Meeting Briefs

ROAD CONTRACTS APPROVED Austin Tyler Construction Contract: The committee approved a $691,544 contract with Austin Tyler Construction for resurfacing River Road from East Frontage Road to Prairie Creek Bridge and...
About Us Website Header - 1

New Lenox Library Board Seats New Trustees, Reorganizes After Election

NEW LENOX – The New Lenox Public Library District Board of Trustees officially seated its newly elected members and reorganized its leadership and committee assignments for the new term at...
New-Lenox-School-122.3

New Lenox D122 Board Approves Nearly $300,000 for Summer Maintenance Projects

The New Lenox School District 122 Board of Education has approved a comprehensive list of 56 maintenance and capital improvement projects to be completed over the summer, allocating a total...
new-lenox-fire-district-stations.3

New Lenox Fire District to Launch Comfort Dog Program for First Responders, Community

NEW LENOX – The New Lenox Fire Protection District is adding a four-legged member to its team after the Board of Trustees unanimously approved the creation of a new comfort...