—Photo by Glenn P. Knoblock

Forest Preserve District Advances Major Extensions and Repairs on Plum Creek Greenway Trail in Crete Township

Spread the love

Article Summary: The Forest Preserve District is currently undertaking dual construction projects on the Plum Creek Greenway Trail, initiating a massive 1.5-mile southern extension through Plum Valley Preserve and commencing repairs on an 80-foot bridge damaged by a fallen tree in Goodenow Grove Nature Preserve.

Plum Creek Greenway Trail Projects Key Points:

  • A new 1.5-mile trail extension will connect Plum Valley Preserve to Goodenow Grove Nature Preserve in Crete Township, with an estimated completion date of fall 2026.

  • The extension features the installation of 800 feet of elevated concrete boardwalks and a 150-foot bridge over Plum Creek, which will become the District’s largest single-span bridge.

  • Repairs began in early March on an 80-foot bridge in Goodenow Grove that was heavily damaged by a fallen tree in January 2025. Contractors are installing new footings, supports, and decking.

  • Future phases of the trail extension aim to connect the path north into Cook County and south to Beecher via the proposed Vincennes Trail.

  • The projects are locally funded by the Forest Preserve District’s Capital Improvement Program and a 2024–2028 grant from the Chicago Metropolitan Agency for Planning.

The Forest Preserve District announced in early March that dual construction projects are currently underway to expand and repair the Plum Creek Greenway Trail, promising significant upgrades for outdoor recreation in Crete Township and the surrounding Will County communities.

The most expansive of the two projects is a new 1.5-mile trail extension that will head south, winding through a hilly section of Plum Valley Preserve. The new multi-use trail will feature a 10-foot-wide path with 3-foot turf shoulders on each side. The extension will consist of a half-mile of crushed limestone, a half-mile of asphalt, and a half-mile street route.

The short street connection will be marked with explicit street signs and pavement directions, leading path users from the newly built trail section to an existing 3.15-mile leg of the Plum Creek Greenway Trail at Goodenow Grove Nature Preserve. The new construction is being added to an existing 1-mile crushed limestone segment that extends south from the Plum Valley Preserve entrance and dog park.

“Upon completion, the project will eliminate a gap in the existing trail system, resulting in a continuous greenway trail connection between Goodenow Grove Nature Preserve and the Plum Valley Preserve – Burville Road access,” said Colleen Novander, the Forest Preserve District’s director of planning and land preservation.

To navigate sensitive ecological areas, contractors are actively installing sections of a precast concrete pedestrian boardwalk to elevate the path. Crews will lay down one 600-foot section and another 200-foot section of boardwalk, utilizing massive concrete components that weigh 4,000 pounds each.

Additionally, concrete abutments are being poured and cured to support a new bridge spanning Plum Creek. Expected to be installed later in April, the 150-foot structure will be the largest single-span bridge in the District.

To minimize environmental impact to existing natural features like wetlands, ravines, and sensitive habitats, the engineering phase dictated that construction remain confined to a designated corridor with a maximum width of 100 feet.

The extension project, which carries an estimated completion date of fall 2026, is funded by the Forest Preserve District’s Capital Improvement Program. Supplemental funding support is provided through the Chicago Metropolitan Agency for Planning’s (CMAP) 2024–2028 Locally Programmed Transportation Alternatives Program (TAP-L).

Looking ahead, District officials noted that future phases of the trail will provide a critical north–south connection, eventually extending the path north into Cook County and south to the Village of Beecher via the proposed Vincennes Trail.

Goodenow Grove Bridge Repairs
While the extension moves forward, a separate set of contractors began repair work in early March on an existing bridge located in the eastern section of Goodenow Grove Nature Preserve, near East Bemes Road.

The 80-foot bridge, which sits just north of the preserve’s well-known “big bridge,” was significantly damaged in January 2025 when a large tree fell on the structure. Following the incident, the District consulted engineers to determine if the bridge required a total replacement or if it could be salvaged. Engineers ultimately concluded that the structure could be repaired.

Originally built in 2011 in tandem with the initial construction of the Plum Creek Greenway Trail and a capital redesign project at Goodenow Grove, the bridge requires extensive rehabilitation. Contractors are currently replacing one of the bridge’s main support structures and pouring new concrete footings. Additionally, all of the bridge’s decking and railings will be entirely replaced.

“It will look like a brand new bridge,” stated Chris Moeller, a Forest Preserve operations department supervisor.

The section of the Plum Creek Greenway Trail affected by the damage has been closed to the public since the tree fell in January. District officials anticipate the repairs will take several weeks to complete, noting that weather and other factors could impact the timeline. The trail segment will officially reopen once the reconstruction is finalized.

—Photo by Glenn P. Knoblock

Leave a Comment





Latest News Stories

Illinois lawmakers give raises to diversity commissioners they criticized

Illinois lawmakers give raises to diversity commissioners they criticized

By Jared Strong | The Center SquareThe Center Square (The Center Square) -- State lawmakers failed to reform the Illinois Commission on Equity and Inclusion this legislative session despite bipartisan...
Taxpayer risk cited after Bears stadium bill stalls

Taxpayer risk cited after Bears stadium bill stalls

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Chicago Bears stadium legislation is stalled after questions arose about a potentially unpopular tax structure and financial...
Illinois Quick Hits: General Assembly approves CTE bill

Illinois Quick Hits: General Assembly approves CTE bill

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – A bill offering career technical education classes as an alternative to Illinois’ foreign language mandate is headed...
Amended scooter, e-bike bill heads to governor

Amended scooter, e-bike bill heads to governor

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – The Illinois General Assembly has passed a bill to regulate e-bikes, scooters and other micromobility devices, but...
Property tax-free Bears deal fails to pass

Property tax-free Bears deal fails to pass

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – The Illinois legislative session has ended with no stadium deal for the Chicago Bears. House Bill 958...
Illinois Quick Hits: Loyola student's alleged killer charged with new felony

Illinois Quick Hits: Loyola student’s alleged killer charged with new felony

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Late Loyola University student Sheridan Gorman’s alleged killer has been charged with possessing a 6-inch shank in...
$55.9 billion budget includes new taxes, 'no property tax relief'

$55.9 billion budget includes new taxes, ‘no property tax relief’

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – The Illinois General Assembly has voted to approve a record-high budget for fiscal year 2027, with new...
Illinois to require bell-to-bell student phone ban in public schools

Illinois to require bell-to-bell student phone ban in public schools

By Sean Reed | The Center SquareThe Center Square (The Center Square) – Legislation to ban the use of cell phones by students from bell-to-bell officially passed both chambers in...
Illinois Quick Hits: Housing, megaprojects take backseat to budget talks

Illinois Quick Hits: Housing, megaprojects take backseat to budget talks

By Sean Reed | The Center SquareThe Center Square (The Center Square) – Top Democrat leaders in the Illinois legislature met with Gov. J.B. Pritzker late Friday behind closed doors...
Taxpayer watchdog calls for accountability after helicopter prom controversy

Taxpayer watchdog calls for accountability after helicopter prom controversy

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – A taxpayer watchdog is calling for a potential criminal investigation after allegations surfaced that a suburban...
Screenshot 2026-05-23 at 7.23.02 PM

District 210 Transportation Update Details Fuel Swings, New Bus Safety Technology

Lincoln-Way Community High School District 210 Meeting | May 21, 2026 Article Summary: Lincoln-Way District 210 Transportation Director Andy Rezer told the board on Thursday, May 21, 2026, that fuel...
Illinois Quick Hits: Unemployment numbers rise; Champaign job growth continues

Illinois Quick Hits: Unemployment numbers rise; Champaign job growth continues

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – According to data from the U.S. Bureau of Labor Statistics and the Illinois Department of Employment Security,...
Screenshot 2026-05-23 at 7.23.02 PM

Lincoln-Way 210 Reports Lowest High School Tax Rate in the Area

Lincoln-Way Community High School District 210 Meeting | May 21, 2026 Article Summary: Superintendent Dr. Scott Tingley told the Lincoln-Way District 210 board on Thursday, May 21, 2026, that the...
Screenshot 2026-05-23 at 7.23.02 PM

Lincoln-Way North to Host TV Pilot Filming Under $210,000 Rental Deal

Lincoln-Way Community High School District 210 Meeting | May 21, 2026 Article Summary: The Lincoln-Way District 210 Board of Education on Thursday, May 21, 2026, unanimously approved a rental agreement...
Screenshot 2026-05-23 at 7.23.02 PM

Lincoln-Way 210 Backs Mokena Downtown TIF Extension to 2044

Lincoln-Way Community High School District 210 Meeting | May 21, 2026 Article Summary: The Lincoln-Way Community High School District 210 Board of Education on Thursday, May 21, 2026, voted unanimously...