Millions Approved for Will County Highway and Road Infrastructure Projects
Will County Board Meeting | April 16, 2026
Article Summary: The Will County Board authorized nearly $4.3 million in road improvement contracts, targeting key corridors including Francis Road, Renwick Road, and Laraway Road.
Infrastructure Key Points:
-
Austin Tyler Construction was awarded a $2,984,218.25 contract to rebuild and widen Francis Road.
-
P.T. Ferro Construction secured a $958,266.60 contract to resurface Renwick Road.
The Will County Board on Thursday, April 16, 2026, greenlit a slate of major infrastructure investments across the region, passing multiple resolutions on the consent agenda without opposition.
The largest expenditure was authorized by Resolution 26-113, which awarded a $2,984,218.25 contract to Austin Tyler Construction, Inc. The Elwood-based firm was the low bidder for a comprehensive project on Francis Road (County Highway 64) from Gougar Road to Wirt Road in County Board District 5. The scope of work includes roadway reconstruction and widening, storm sewer installation, drainage ditch improvements, culvert reconstruction, and retaining wall installation. The project is slated to begin in June 2026, during which the road will be closed to through traffic.
In Plainfield Township, the Board approved Resolution 26-114, confirming a $958,266.60 contract with Joliet-based P.T. Ferro Construction Co. The firm will resurface Renwick Road (CH 36) from east of U.S. Route 30 to west of Weber Road. The project, which also begins in June, will utilize Hot-Mix Asphalt (HMA) surface removal and replacement, centerline rumble strips, and deck slab repairs. The roadway will remain open during construction with periodic lane closures guided by flaggers. P.T. Ferro also secured a separate $194,014.90 contract (RES 26-115) to resurface various subdivision roadways within the Plainfield Road District.
The Board also took action on Laraway Road in New Lenox. Resolution 26-112 authorizes an agreement with LNS Development Group, LLC for stormwater management improvements along Laraway Road between Cedar Road and Spencer Road. The county will reimburse the developer an estimated $352,071.95 for the construction of a shared detention facility and storm sewer upgrades required for the county’s future plans to widen Laraway to a four-lane, barrier-median roadway.
Latest News Stories
78 pro-life orgs ask DOJ to stop undermining state laws by favoring aborting drug industry
Lincoln-Way East Boys Outpace West and Stagg to Claim SWSC Triangular Victory
Lincoln-Way East Girls Track Dominates Triangular Meet Against West and Stagg
Illinois Quick Hits: Two of ComEd four released; new trial expected
Will County Treasurer Seeks Policy on Cash Payments as U.S. Mint Discontinues the Penny
Lend a hand this spring at Volunteer Morning programs
Proposed State Legislation Sparks Debate Over Will County Veterans Assistance Commission Budget Control
Chicago suit vs oil cos. may yet survive SCOTUS ruling, judge hints
Two of ComEd Four released. new trial pending
GOP candidate Bailey urges Trump to apologize to pope; bishop calls for dialogue
Senator says taxpayers fleeced by corrections department
Illinois Quick Hits: CTU-backed senator launches ‘tax the rich’ campaign