Millions Approved for Will County Highway and Road Infrastructure Projects
Will County Board Meeting | April 16, 2026
Article Summary: The Will County Board authorized nearly $4.3 million in road improvement contracts, targeting key corridors including Francis Road, Renwick Road, and Laraway Road.
Infrastructure Key Points:
-
Austin Tyler Construction was awarded a $2,984,218.25 contract to rebuild and widen Francis Road.
-
P.T. Ferro Construction secured a $958,266.60 contract to resurface Renwick Road.
The Will County Board on Thursday, April 16, 2026, greenlit a slate of major infrastructure investments across the region, passing multiple resolutions on the consent agenda without opposition.
The largest expenditure was authorized by Resolution 26-113, which awarded a $2,984,218.25 contract to Austin Tyler Construction, Inc. The Elwood-based firm was the low bidder for a comprehensive project on Francis Road (County Highway 64) from Gougar Road to Wirt Road in County Board District 5. The scope of work includes roadway reconstruction and widening, storm sewer installation, drainage ditch improvements, culvert reconstruction, and retaining wall installation. The project is slated to begin in June 2026, during which the road will be closed to through traffic.
In Plainfield Township, the Board approved Resolution 26-114, confirming a $958,266.60 contract with Joliet-based P.T. Ferro Construction Co. The firm will resurface Renwick Road (CH 36) from east of U.S. Route 30 to west of Weber Road. The project, which also begins in June, will utilize Hot-Mix Asphalt (HMA) surface removal and replacement, centerline rumble strips, and deck slab repairs. The roadway will remain open during construction with periodic lane closures guided by flaggers. P.T. Ferro also secured a separate $194,014.90 contract (RES 26-115) to resurface various subdivision roadways within the Plainfield Road District.
The Board also took action on Laraway Road in New Lenox. Resolution 26-112 authorizes an agreement with LNS Development Group, LLC for stormwater management improvements along Laraway Road between Cedar Road and Spencer Road. The county will reimburse the developer an estimated $352,071.95 for the construction of a shared detention facility and storm sewer upgrades required for the county’s future plans to widen Laraway to a four-lane, barrier-median roadway.
Latest News Stories
Judge: SCOTUS ruling doesn’t necessarily end block on Trump DEI orders
WATCH: California attorney general talks about Prop. 50
Illinois quick hits: Man charged with threatening Trump; judge grants injunction in shelter funding case
WATCH: IL GOP Rep: Sanctuary expansion bill may expose many to civil lawsuits
Senators introduce legislation to codify Antifa terror designation
DHS proposes billion dollar expanded DNA testing for immigrants
Trump administration resumes visa processing despite shutdown
Muslims in Virginia, New York face decades in prison for supporting Houthis, ISIS
Indian reservation focus of human smuggling probe at U.S.-Canada border
WATCH: Family, friends remember Bailey family at celebration of life
WATCH: Amid criticism, Pritzker defends using expletive to tell Trump where to go
Election integrity advocates urge reform after Illinois scores low in global survey
WATCH: Pritzker’s rhetoric criticized; tax amnesty program; status of Guard lawsuit