Will County P&Z Logo Planning Zoning.2

Zinc Leaching and Flooding Concerns Dominate Testimony at Will County Solar Hearing

Spread the love

Will County Board Special Planning and Zoning Commission Meeting | May 12, 2026

Article Summary: Expert and resident testimonies during Tuesday’s Planning and Zoning Commission meeting highlighted severe concerns over groundwater contamination and flooding if a 6,000-acre solar farm is built on hydric soils.

Environmental Impact Key Points:

  • A Will-South Cook Soil and Water Conservation District report (NRI #5824) classified the site as “essential farmland” with a LESA score of 236.

  • Approximately 2,152 acres of the proposed site contain hydric soils that present a high risk for steel corrosion.

  • A foundation drilling expert testified that driving raw galvanized steel posts into hydric soil could cause rapid corrosion, risking zinc leaching into local aquifers.

  • Residents from Green Garden Township presented video evidence of existing severe flooding on parcels adjacent to the proposed solar arrays.

A debate over soil chemistry, galvanized steel, and floodplains took center stage at the Will County Planning and Zoning Commission on Tuesday, May 12, 2026, as residents and experts warned of potential environmental disasters from the proposed Earthrise solar project.

During the court-ordered cross-examination hearing, plaintiffs focused heavily on Natural Resource Information Report #5824, prepared by the Will-South Cook Soil and Water Conservation District. The report calculated a Land Evaluation and Site Assessment (LESA) score of 236 for the property—classifying it as essential farmland—and noted that approximately 2,152 acres of the site consist of hydric soils.

Crucially, the report indicated that the site presents a “high” risk for steel corrosion. Plaintiff Attorney Steven Becker questioned Earthrise developers on their plan to drive an estimated 300,000 bare galvanized steel posts into the ground to support the 1.19 million solar modules.

To support the plaintiffs’ claims, Melissa Eager, an operating engineer with 30 years of experience in the caisson drilling industry, testified about the dangers of placing untreated steel into wet soils.

“Anything put into ground that is wet is going to eventually leach out,” Eager testified. “A pinhole into that galvanization will corrode… when put in a hydric soil or wet locations it’s usually anywhere from 3 to 5 years.”

Eager suggested that the posts should be coated in epoxy or encased in concrete. However, she warned that using heavy machinery to encase thousands of posts in concrete would heavily compact the area’s silty loam soil, creating a “hard pan” that would drastically increase surface erosion and water runoff.

Earthrise Lead Developer Robert Kalbouss and attorney Ben Jacobi refuted the claims, relying on prior testimony from their environmental scientist, Dr. Chris Olsen. Jacobi stated that any leaching from the galvanized steel would be minimal and isolated directly next to the pile, posing no threat to crops or groundwater.

“There is no evidence of or documented evidence of steel piles from solar facilities leaching into the groundwater. It doesn’t exist,” Jacobi said. “We don’t believe that our construction methods pose a risk to public health or agriculture.”

The potential for exacerbated runoff struck a nerve with neighboring property owners. Green Garden Township residents Jim Michalewicz and Donna Robinson presented photographs and video footage showing substantial standing water and flooding on their properties, which abut the proposed solar parcels.

Robinson showed video of her yard flooding on three sides, noting that neighboring landowners had failed to maintain culverts, causing water to back up onto her property. She expressed deep concern that industrial development on the adjacent fields would push even more water into her yard.

Becker underscored these concerns, pointing out that the Earthrise project footprint sits near the headwaters of Fork Creek, Prairie Creek, and Hickory Creek. He warned the commission that any groundwater contamination could easily travel into these tributaries, potentially violating the federal Clean Water Act.

Leave a Comment





Latest News Stories

Committee-Executive.Graphic

Executive Committee Advances $28.7 Million BNSF Bridge Project for Lorenzo Road

Will County Executive Committee Meeting | February 11, 2026 Article Summary: The Executive Committee approved an agreement with BNSF Railway to construct a grade separation bridge on Lorenzo Road in...
Committee-Land Use.Graphic

Land Use Committee: ‘Clean Fill’ Proposal Stalls After Unauthorized Tree Removal Sparks Environmental Concerns

Will County Land Use & Development Committee Meeting | February 5, 2026 Article Summary: A request to rezone land for a "clean fill" operation in Joliet Township stalled in committee...
Screenshot 2026-02-22 at 4.29.56 PM

Contracts Approved for New West Principal and District Technology Director

Lincoln-Way District 210 Board of Education Meeting | February 19, 2026 Article Summary: The Board appointed Dr. Jennifer Killeen as the new Principal of Lincoln-Way West High School and Kyle...
mokena school district 159.2

Board Member Clashes with Colleagues Over Meeting Minutes and Bill Review Transparency

Mokena School District 159 Meeting | February 18, 2026 Article Summary: A disagreement over the level of detail included in meeting minutes and the sharing of questions regarding district bills sparked...
Committee-Planning & Zoning.Graphic

Meeting Summary and Briefs: Will County Planning and Zoning Commission for February 17, 2026

Will County Planning and Zoning Commission Meeting | February 17, 2026 JOLIET, IL – The Will County Planning and Zoning Commission met on Tuesday, February 17, 2026, with Acting Chairman John...
Committee-Ad-Hoc.Graphic

Ad-Hoc Committee: Liquor Ordinance Stalls Over Drafting Errors; Debates License Cap Policy

Will County Ad-Hoc Ordinance Review Committee Meeting | February 10, 2026 Article Summary: The Will County Board Ad-Hoc Ordinance Review Committee postponed a vote on the comprehensive update to the...
Screenshot 2026-02-22 at 5.06.42 PM

Board Approves New Chief of Staff and Dean Roles; Trustees Clash Over Hiring Transparency

Joliet Junior College Board of Trustees Meeting | February 18, 2026 Article Summary: The JJC Board approved the appointments of a new Chief of Staff and a Dean of Workforce...
Committee-Executive.Graphic

Green Garden Township Residents Threaten Incorporation to Block 6,000-Acre Solar Farm

Will County Executive Committee Meeting | February 11, 2026 Article Summary: Residents of Green Garden Township warned county officials they are moving to incorporate as a village to gain zoning...
Screenshot 2026-02-22 at 4.29.56 PM

Board Approves $479,000 Wireless Network Overhaul to Replace Aging Tech

Lincoln-Way District 210 Board of Education Meeting | February 19, 2026 Article Summary: The Board of Education approved a $479,526.96 contract with CDW to replace the indoor wireless access points...
mokena school district 159.3

Principals Present Mid-Year Data Showing Gains in Writing and Math Proficiency

Mokena School District 159 Meeting | February 18, 2026 Article Summary: Mokena School District 159 principals presented mid-year updates on their School Improvement Plans, highlighting data-driven gains in writing proficiency and...
Committee-Executive.Graphic

Executive Committee: Tension Rises as Republican Whip Removed from Panel

Will County Executive Committee Meeting | February 11, 2026 Article Summary: A dispute over committee appointments erupted when Republican leadership challenged the removal of Member Vince Logan from the Executive...
Committee-Ad-Hoc.Graphic

Ad-Hoc Committee: County Stripped of Power to Regulate Motor Races, Must Drop Solicitor Fees Due to State Statutes

Will County Ad-Hoc Ordinance Review Committee Meeting | February 10, 2026 Article Summary: The Will County Board Ad-Hoc Ordinance Review Committee repealed county regulations regarding motor stunt events and removed...

Commission Overrides Staff Recommendation, Approves Manhattan Township Barn Expansion

Will County Planning and Zoning Commission Meeting | February 17, 2026 Article Summary: A Manhattan Township homeowner received unanimous approval for three variances to expand a pole barn, despite county...
Committee-Executive.Graphic

Executive Committee Advances “Project Northwinds”: 2,475 Jobs and $346 Million Investment Proposed for Former Caterpillar, Lion Electric Sites

Will County Executive Committee Meeting | February 11, 2026 Article Summary: The Will County Board Executive Committee moved forward a resolution supporting a massive manufacturing project that promises nearly 2,500...
Committee-Land Use.Graphic

Land Use Committee Advances Mokena Scrap Yard and Homer Glen Landscape Business Over Local Objections

Will County Land Use & Development Committee Meeting | February 5, 2026 Article Summary: The Will County Land Use Committee approved special use permits for two businesses in Frankfort and...