Future regional power supply down, but not out

Future regional power supply down, but not out

Spread the love

(The Center Square) – Shrinking power supply remains a challenge according to the grid operator’s most recent capacity auction, signaling that regional utility bills could still climb, albeit more slowly, as demand for electricity grows faster than can be provided.

PJM, the organization tasked with managing the flow of power for 67 million people across 13 states and Washington, D.C., collects annual bids from generators that commit them to providing energy supply over the following 12 months. In this case, it’s for the 2028-29 operating year.

By doing so, the organization can better hedge against blackouts and soaring prices that could happen if there’s not enough power to turn on furnaces in the dead of winter or air conditioning at the height of summer.

“These auction results show that demand for electricity continues to grow faster than electricity supply,” said David Mills, PJM president and CEO. “At the same time, PJM recognizes how this supply-and-demand imbalance impacts the reliability of the system and costs for consumers. We are working with government and industry leaders on multiple fronts to restore that balance by bringing on new generation as fast as possible and managing the growth of new load on the grid.”

But a better solution, according to energy producers, state officials, and PJM alike, would be to plug more supply into the grid, which can help limit the stress fractures anticipated from the data center boom.

Auction Price

Results of PJM’s 2028-2029 Base Residual Auction show the price reached the federally approved cap of $325 per MW-day throughout the PJM region – 2.5% below the $333.44 price in the previous auction.

The auction’s cleared capacity totaled $16.4 billion. PJM notes that figure does not represent the total cost to customers because some utilities and other load-serving entities secure capacity through self-supply arrangements or bilateral contracts and are not subject to the auction clearing price.

Katie Blume, coalition chair of Clean Power PA, said the results amounted to “more of the same: high prices driven by surging data center demand, and a grid that’s getting less reliable, not more.”

Blume credited the price cap negotiated by Gov. Josh Shapiro with preventing steeper increases, saying it has saved consumers nearly $13 billion over two auctions. However, she said a cap does not add new power supplies or resolve PJM’s underlying problems.

She called for making data centers pay their “fair share” of grid costs and accelerating the connection of wind, solar, and battery-storage projects.

Reliability Shortfall

For the second consecutive auction, PJM secured less capacity than required to meet its reliability target. The 2028-2029 auction fell short by 6,831 MW, leaving the grid below the reserve cushion required to meet a one-in-10-year reliability standard.

A rough estimate puts the total number of homes powered by that many megawatts around 5.5 million. This figure assumes PJM’s standard of 1 MW is equal to supplying an average of 800 homes.

The organization, however, said that the shortfall does not necessarily mean the system will be unable to meet demand. It means the grid will operate with slimmer reserves and greater risk during extreme conditions. It continues to hold a reserve margin of 14.7%.

The shortfall was not unexpected given the trend. The previous auction fell approximately 6,500 MW short, and large load projects continue to be added to the demand forecast.

Forecast peak demand for 2028-2029 is approximately 2,000 MW higher than in the previous delivery year.

Supply and Proposed Solutions

The auction secured 138,318 MW of capacity, an increase of 3,733 MW from the previous auction. That included 525 MW from new generation and upgrades to existing plants.

That’s enough supply to power 69 million and 138 million homes, dependent upon the season.

The committed resources include: 46% natural gas, 20% nuclear, 18% coal, 5% demand response, 4% hydro, 2% wind, 2% oil, and 1% solar.

PJM said it is working to increase supply and manage demand by clearing its project queue, creating a faster pathway for certain high-priority generation proposals, improving the performance of existing plants, and developing “Connect and Manage” frameworks that would allow data centers and other large users to connect under flexible operating conditions.

The grid operator also plans to seek federal approval for a Reliability Backstop Procurement intended to address near-term supply needs.

“All of these initiatives are critical to keeping the lights on while allowing states to protect their everyday electricity customers,” Mills said.

Electric Power Supply Association President and CEO Todd Snitchler said historically low capacity prices had discouraged investment in generation, while the higher prices that began with PJM’s July 2024 auction prompted companies to announce, restart, expand, or advance tens of gigawatts of projects.

Snitchler said the immediate challenge is turning that investment into additional electricity supply by accelerating permitting, siting, and grid interconnection. He also cautioned against allowing utilities to finance new generation through mandatory customer charges, arguing that competitive suppliers and investors should continue to bear construction risks.

Claire Lang-Ree, advocate for climate and energy for the Natural Resources Defense Council said, the results confirm that data center growth is outpacing new electricity supply, weakening reliability, and keeping prices at the cap.

She called on PJM and state officials to ensure data centers pay for generation and transmission built to serve them and to accelerate the interconnection of lower-cost clean energy projects.

“The 67 million PJM residents literally can’t afford to suffer any more record-breaking auctions or near-blackout events,” Lang-Ree said.

PJM expects to submit its Reliability Backstop and Connect and Manage proposals to the Federal Energy Regulatory Commission in the coming weeks.

The next Base Residual Auction, for the 2029-2030 delivery year, is scheduled for December as PJM works to restore its three-year-ahead auction cycle.

Today Jul 24
Mostly Cloudy
76° 69°

Mostly Cloudy

💨 5 to 10 mph 💧 9%

Leave a Comment





Latest News Stories

Trump administration finds SNAP fraud

Trump administration finds SNAP fraud

By Andrew RiceThe Center Square Amid the ongoing government shutdown, the U.S. Department of Agriculture is seeking to root out fraud in the Supplemental Nutrition Assistance Program, also known as...

WATCH: Trump says tariffs may cost Americans ‘something’ but keep U.S. safe

By Brett RowlandThe Center Square President Donald Trump said Thursday Americans should be thankful for his tariffs, which he said he has used to end wars that Americans would otherwise...
Chicago mayor: IL legislature has 'more work to do' on tax increases

Chicago mayor: IL legislature has ‘more work to do’ on tax increases

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Chicago Mayor Brandon Johnson wants to see more tax increases from the Illinois General Assembly, but a...
White House secures deal on weight loss drugs

White House secures deal on weight loss drugs

By Morgan SweeneyThe Center Square The White House has secured another deal with major pharmaceutical companies, this time to offer popular weight loss drugs for less in some cases. On...
Chicago pension, debt services costs among highest in country

Chicago pension, debt services costs among highest in country

By Glenn Minnis | The Center Square contributorThe Center Square (The Center Square) – Chicago’s budget has grown by nearly 40% since 2019 with the biggest increased expenditure going toward...
WATCH: DCFS still looking for missing children numbers; Pritzker on elections results

WATCH: DCFS still looking for missing children numbers; Pritzker on elections results

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop continues his coverage...
Illinois quick hits: DHS ordered to address ICE facility conditions; Garcia explains retirement decision

Illinois quick hits: DHS ordered to address ICE facility conditions; Garcia explains retirement decision

By Jim Talamonti | The Center SquareThe Center Square DHS ordered to address ICE facility conditions A U.S. District Court judge in Chicago has issued a temporary restraining order directing...
Meeting Briefs

Meeting Summary and Briefs: Mokena Community Park District for September 23, 2025

Mokena Community Park District Meeting | September 23, 2025 The Mokena Community Park District Board of Commissioners celebrated the success of recent projects and updated its financial policies during its...
Congressional Perks: Luxury cars and mileage result in big costs for taxpayers

Congressional Perks: Luxury cars and mileage result in big costs for taxpayers

By Arthur Kane | The Center SquareThe Center Square (The Center Square) – U.S. Reps Darrell Issa, R-Calif., and David Scott, D-Ga., have each had taxpayers pay as much as...
Concept of inflation, rising interest rates and economic growth.

Mokena Village Board Approves Sales Tax Increase to Fund Infrastructure

Village of Mokena Board of Trustees Meeting | October 27, 2025 Article Summary: The Mokena Village Board has approved an ordinance to increase the non-home rule municipal sales tax by...
Illinois quick hits: $20 million for Alton housing project; alleged migrant assaults reported

Illinois quick hits: $20 million for Alton housing project; alleged migrant assaults reported

By Jim Talamonti | The Center SquareThe Center Square $20 million for Alton housing project Gov. J.B. Pritzker and the Illinois Housing Development Authority announced the opening of a $20...

WATCH: Illinois DCFS can’t locate documents showing number of missing children

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – Documents to show the number of missing youth in care from the Department of Children and Family...
Will Dial-A-Ride Service

Will County Committee Advances Phased Takeover of Central Will Dial-A-Ride Service

Will County Public Works & Transportation Committee Meeting | November 2025 Article Summary: The Will County Board approved a five-year plan to consolidate the Central Will Dial-A-Ride service into its...

WATCH: Pritzker: ‘Government isn’t always the best option’

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Illinois Gov. J.B. Pritzker says government is not always the best option when it comes to private...
mokena fire protection district logo graphic.4

Mokena Fire District Approves $114,000 Overhaul for Ailing Fire Truck

Mokena Fire Protection District Meeting | September 2025 Article Summary: The Mokena Fire Protection District Board of Trustees has approved a $114,000 plan for a complete mechanical update and corrosion repair...