$750 million facility to protect Texas cattle, wildlife from screwworm threat

$750 million facility to protect Texas cattle, wildlife from screwworm threat

Spread the love

Responding to calls by state lawmakers and the agricultural industry for immediate action to be taken to protect cattle and wildlife from a parasitic fly, the Trump administration is investing $750 million to build the first U.S.-based Sterile Screwworm Production Facility.

The U.S. Department of Agriculture is building it at Moore Air Force Base in Edinburg, Texas. Built with the Army Corps of Engineers, it will produce up to 300 million sterile flies per week to eradicate the NWS. It will be the only sterile fly facility in the U.S. in a key location at the U.S.-Mexico border.

A deadly parasitic fly, the NWS is believed to be 370 miles south, flying north through Mexico from Central America. It has the potential to wipe out Texas cattle in a state that produces the most in the U.S. as well as livestock in other states. It also has the potential to kill a wide range of wildlife that could wipe out the Texas game industry, tourism, livelihoods and cause billions of dollars in losses.

In May, the USDA closed the US-Mexican border to livestock imports. However, the NWS continues to move north, and if not stopped, could reach Texas in roughly a month.

As a result, 94 House members, led by state Rep. Ryan Guillen, R-Rio Grande City, called on Gov. Greg Abbott to add NWS preventative measures to the special session agenda.

The NWS larvae (maggots) burrow into (screw in) wounds of livestock, pets, wildlife and sometimes people. The more maggots, the more the animal is eaten alive. The parasite is endemic in Cuba, the Dominican Republic, Haiti and in South American countries. A current outbreak has been reported in Central America and Mexico.

The NWS threatens more than $100 billion worth of U.S. economic activity tied to the cattle and livestock industry alone, the USDA says.

While the Panama facility produces 100 million sterile flies a week and Mexico’s upcoming facility will produce 100 million sterile flies a week, the U.S. facility will end a “United States-based reliance on foreign facilities for sterile fly production,” the USDA says.

After assessing information on the ground in Mexico, the USDA “determined we must construct an additional sterile fly production facility in the U.S. to stop the northward advancement of this terrible pest that is threatening American cattle production,” USDA Secretary Brooke Rollins said. “President Trump has made it clear that we must take all necessary steps to protect our country from foreign pests and diseases that threaten our economy and way of life. The construction of a domestic sterile fly production facility will ensure the United States continues to lead the way in combating this devastating pest. If our ranchers are overrun by foreign pests, then we cannot feed ourselves.”

The USDA also is hiring mounted horseback patrol officers, known as “Tick Riders,” and other staff to implement border surveillance. Tick Riders and animal health experts will patrol the border to “provide the first line of defense against an NWS outbreak along the United States-Mexico border,” the USDA says.

The USDA is also training dogs to detect screwworm infestations in livestock and other animals along the border and at ports of entry. The USDA is also working with the Department of the Interior and the U.S Customs and Border Protection to search for any wildlife infected by the NWS.

So far, the NWS has not been reported or detected in the U.S. in any animal.

The USDA and CBP “are constantly monitoring our ports of entry to keep NWS away from our borders. We are working every day to ensure our American agricultural industry is safe, secure, and resilient,” Rollins said.

“Texas agricultural producers feed the world, with our state’s food and agriculture sector supporting over two million good-paying jobs and creating over $867 billion in total economic impact. All of this is at risk because of the New World screwworm,” Abbott said. Federal and state efforts “will eradicate New World screwworm threat to protect our nation’s food supply and economy,” he said.

While Abbott didn’t add NWS legislation to the second special session, he previously directed state agencies to establish a response team to ensure Texans remain “informed, prepared, and aligned to prevent the re-emergence of this destructive parasite.”

Texas Farm Bureau President Russell Boening said the new Edinburg facility is a “pivotal step forward” to protect Texas livestock and wildlife. “It’s a vital investment in safeguarding our livestock, wildlife, rural communities, and the consumers who rely on a safe and stable food supply.

“A domestic outbreak of NWS could result in catastrophic losses, with estimates of $1.8 billion annually in Texas cattle alone and more than $10.6 billion in national economic damages. This threat is real and urgent, and we cannot afford delays. Immediate construction and deployment of this facility are essential to prevent irreversible harm to the agricultural economy and our nation’s food system.”

Events

No events

Leave a Comment





Latest News Stories

Enbridge Energy

Will County to Pay Enbridge $82,000 to Relocate Pipeline Equipment for Exchange Street Improvements

Article Summary: Will County will reimburse Enbridge Energy for costs associated with relocating its pipeline facilities to make way for roadway improvements on Exchange Street in the Monee and Crete...
diamond shaped orange red reflector street sign that reads road

Laraway Road Widening Project in New Lenox and Frankfort Gets Additional $468,000 for Redesign

Article Summary: The Will County Board approved a supplemental agreement worth $468,374 for additional design and engineering work on the major Laraway Road expansion project. The funds are needed for...
solar panels photovoltaics in solar farm

“Federal Policy Uncertainty” Blamed for Delay of Peotone Solar Farm; County Grants Second Extension

Article Summary: The Will County Board has granted a second permit extension for a solar farm in Peotone Township after the developer, Trajectory Energy Partners, cited "ongoing uncertainty regarding federal...
solar panels photovoltaics in solar farm

Will County Grants Extensions to Five Solar Projects Sold to New Developers

Article Summary: The Will County Board approved first-time permit extensions for five commercial solar projects across Monee, Crete, and Joliet townships, all of which were recently sold to larger energy...
WCO 2025-09-27 at 9.04.10 AM

Will County Board Approves Controversial Drug Recovery Retreat in Crete Township

Article Summary: The Will County Board has approved a special use permit for The Second Story Foundation to operate a long-term residential recovery program for men on a 68-acre horse...
Meeting-Briefs

Meeting Summary and Briefs: Mokena Fire Protection District for August 2025

Mokena Fire Protection District Meeting | August 2025 The Mokena Fire Protection District Board of Trustees on Tuesday, August 12, 2025, focused on fleet management, approving the final payment for...
Meeting Briefs

Meeting Summary and Briefs: Mokena Village Board for September 15, 2025

Mokena Village Board Meeting | September 15, 2025 The Mokena Village Board held a special meeting on Monday, September 15, 2025, where its primary action was the unanimous approval of...
Mokena Logo Graphic.5

Mokena Board Approves Final Plat for 50-Home Boulder Ridge Phase IV Subdivision

Mokena Village Board Meeting | September 15, 2025 Article Summary: The Mokena Village Board approved the final plat for the 50-lot fourth phase of the Boulder Ridge subdivision, clearing the way...
mokena fire protection district logo graphic.3

Mokena Fire District Hiring, Deploys Drone to Assist Frankfort in Crisis

Mokena Fire Protection District Meeting | August 2025 Article Summary: The Mokena Fire Protection District is in the process of hiring a new firefighter/paramedic after receiving 11 applications for a vacant...
Meeting Briefs

Meeting Summary and Briefs: Mokena Village Board for September 8, 2025

Mokena Village Board Meeting | September 8, 2025 The Mokena Village Board on Monday, September 8, 2025, unanimously approved a major overhaul of its police ticketing system, raising fines for...
Mokena Logo Graphic.5

Mokena Board Greenlights Boulder Ridge Development Settlement

Mokena Village Board Meeting | September 8, 2025 Article Summary: The Mokena Village Board has approved a settlement agreement involving the developer of the Boulder Ridge subdivision, resolving outstanding issues and...
mokena fire protection district logo graphic.5

Mokena Fire District Invests in New Inventory System for $5,500 Annually

Mokena Fire Protection District Meeting | August 2025 Article Summary: The Mokena Fire Protection District is upgrading its internal operations by purchasing a new inventory management system called PSTrax. The board...
Mokena Logo Graphic.1

Mokena Appoints Jacob Hazek as New Village Arborist

Mokena Village Board Meeting | September 8, 2025 Article Summary: The Mokena Village Board has appointed Jacob Hazek to the position of Arborist within the Public Works Department. Hazek was selected...
Mokena Logo Graphic.2

Mokena Awards Nearly $300,000 in Contracts for Road Maintenance and Project Oversight

Mokena Village Board Meeting | September 8, 2025 Article Summary: The Mokena Village Board approved two contracts totaling over $292,000 for its Fiscal Year 2026 street improvement and maintenance programs. The...
Mokena Logo Graphic.6

Mokena Board Approves Sweeping Increases to Police Ticket Fines

Mokena Village Board Meeting | September 8, 2025 Article Summary: The Mokena Village Board unanimously approved a new ordinance that significantly increases fines for a wide range of non-traffic municipal code...