frankfort-village-hall-graphic-logo.7

Frankfort Advances Plans for New Multi-Use Paths to Boost Pedestrian Safety

Article Summary
The Frankfort Village Board has approved a $77,500 agreement with Robinson Engineering, Ltd. to design two new multi-use paths aimed at improving safety and connectivity in Main Park and along Pfeiffer Road. The project addresses resident concerns about pedestrian safety during sporting events and will connect southeastern neighborhoods to the village’s broader trail system.

Multi-Use Path Agreement Key Points:

  • The board approved a $77,500 professional services agreement with Robinson Engineering, Ltd. for the design phase.

  • One path will be built on the west side of Locust Street in Main Park, connecting the north and south parking lots.

  • A second path will run along the east side of Pfeiffer Road, from Laraway Road south to an existing path in the Stone Creek subdivision.

  • The fee covers design, topographic and property surveying, engineering plans, and bidding services.

FRANKFORT – Plans to enhance pedestrian safety and trail connectivity in Frankfort are moving forward after the Village Board on Monday approved a $77,500 contract to design two new multi-use paths.

The board authorized an agreement with Robinson Engineering, Ltd. for the design of a path within Main Park and another along a stretch of Pfeiffer Road. The projects are intended to address safety concerns and expand the village’s trail network.

Trustee Adam Borrelli, who presented the resolution, called the project “a pleasure to present.” He detailed the two locations, noting the first path will run along the west side of Locust Street in Main Park, from the north parking lot to the south parking lot. The second will be constructed on the east side of Pfeiffer Road, extending south from Laraway Road to connect with an existing path in the Stone Creek Phase I subdivision.

During board comments, Borrelli emphasized the project’s importance, calling it a “huge win.” He said the Main Park path directly responds to safety concerns raised by residents.

“Specifically during sporting events, specifically Falcons, and in the fall when it gets real busy over there… the board worked with the park district to come up with a plan to put a walking path along Locust there so that people aren’t walking in the street when they walk over to the ball fields,” Borrelli said. “I think that’s going to improve safety tremendously.”

The Pfeiffer Road path will provide a critical link for residents in the southeastern part of the village. “This is a little south extension that will then connect the neighborhood that starts at Stone Creek, but then also Lake View Estates and so forth,” Borrelli explained. “That’s going to be a huge improvement for our residents.”

The $77,500 fee to Robinson Engineering covers the initial design phase, which includes topographic surveying, property surveying, creating engineering plans and specifications, and handling bidding services. Construction costs are separate; preliminary estimates included in the agenda packet project the Main Park path could cost $180,000 and the Pfeiffer Road path could cost $375,000.

Trustee Maura Rigoni, who is employed part-time by Robinson Engineering, abstained from the vote on this item to avoid a conflict of interest. “For the record, I am not an owner, officer, or registered agent, and I do not have any financial interest in Robinson Engineering beyond my part-time employment,” Rigoni stated before abstaining.

Events

No events

Leave a Comment





Latest News Stories

new-lenox-fire-district-stations.3

New Lenox Fire District to Launch Comfort Dog Program for First Responders, Community

NEW LENOX – The New Lenox Fire Protection District is adding a four-legged member to its team after the Board of Trustees unanimously approved the creation of a new comfort...
new-lenox-library.2-1

Library’s ‘Studio’ Draws Record Crowds with New Tech and Creative Programs

NEW LENOX – The New Lenox Public Library’s creative hub, The Studio, is experiencing a surge in popularity, shattering attendance records and successfully launching new technology-driven programs, according to a...
New-Lenox-School-122.5

D122 to Spend $24,950 on Professional Enrollment Forecast

New Lenox School District 122 will hire an outside firm to conduct a comprehensive, 10-year enrollment forecast at an estimated cost of $24,950. The Board of Education approved an agreement...
Mokena Park District.logo.graphic.1

Mokena Park District Approves $550,000 Fund Transfer for Major Park Projects

The Mokena Community Park District Board of Commissioners has approved a $550,000 fund transfer to complete several key capital projects, including the construction of a new bathroom facility at Hecht...
LWSRA

Mokena Park District Joins Regional Partners in Renewed Funding Commitment for LWSRA

The Mokena Community Park District is renewing its financial commitment to the Lincolnway Special Recreation Association (LWSRA), joining eight other local park districts in an intergovernmental agreement that ensures continued...
mokena park Yunker Barn

Mokena Park District Seeks Nearly $1 Million State Grant for Yunker Barn Renovation

The Mokena Park District is seeking nearly $1 million in state funding to help transform the historic Yunker Park Barn into a year-round facility. Executive Director Greg Vitale announced at...
Meeting-Briefs

Meeting Briefs: Mokena Park District Board of Commissioners for June 27, 2023

The Mokena Park District Board of Commissioners met on June 27 to approve funding for capital projects, renew a regional partnership agreement, and review staff reports on recent and upcoming...
JJC-Graphic-Logo

JJC Trustees Approve Contentious FY26 Budget After Heated Debate, Failed Postponement

The Joliet Junior College Board of Trustees on Wednesday approved a $322.3 million budget for fiscal year 2026, but not before a tense debate that saw a motion to postpone...
mokena library logo graphic.4

Library Board Approves Annual Budget, Begins Review of Financial Advisor Proposals

The Library Board of Trustees unanimously approved its working budget for the new fiscal year at its June 24 meeting and formally began the process of selecting a financial advisor...
Screenshot-2025-07-06-at-9.50.39-AM

Lincoln Way District 210 Approves $2.1 Million Budget Amendment, Maintains Strong Financial Position

Lincoln Way Community High School District 210 board members unanimously approved an amended fiscal year 2025 budget Thursday night that increases the district's operating surplus to $2.1 million while maintaining...
Joliet-Junior-college.-Graphic-Logo.5

JJC’s ‘12x12x12’ Initiative Boosts College Credits, Increases Matriculation Rate

Joliet Junior College’s ambitious "12x12x12" initiative is yielding significant results, leading to more high school students earning college credits and a greater percentage of them choosing to attend JJC after...
Screenshot-2025-07-06-at-9.45.35-AM

District 210 Approves Administrative Restructuring, Staff Salary Increases

Lincoln Way Community High School District 210 board members approved administrative restructuring and salary increases for non-union clerical support staff during closed session actions Thursday night. The board unanimously approved...
Joliet-Junior-college.-Graphic-Logo.4

JJC Board Meeting Highlights Tensions Over Legal Bills, Trustee Conduct

An otherwise routine vote to approve monthly bill payments ignited a tense exchange at the Joliet Junior College Board of Trustees meeting Wednesday, revealing ongoing friction over redacted legal invoices,...
Joliet-Junior-college.-Graphic-Logo.3

Students, Trustees Emphasize Importance of Inclusivity and Flag Raisings at JJC

From a recent graduate’s public plea to trustee remarks on federal policies, the theme of student belonging and inclusivity was a prominent thread at the Joliet Junior College Board of...
Meeting-Briefs

L-W School Board June 26 Meeting Briefs

Special Education District Update: The fence installation around the playground at Lincoln Way Area Special Education District 843 has been completed except for one gate section that will allow equipment...