Mokena Awards Nearly $300,000 in Contracts for Road Maintenance and Project Oversight
Mokena Village Board Meeting | September 8, 2025
Article Summary: The Mokena Village Board approved two contracts totaling over $292,000 for its Fiscal Year 2026 street improvement and maintenance programs. The funds will cover an asphalt sealant application on various roadways and engineering services to oversee a larger construction project.
Mokena Road Contracts Key Points:
-  
A contract for $113,731 was awarded to Denler, Inc. for the application of HA5 High Density Mineral Bond sealant.
 -  
A second contract for up to $178,365 was awarded to Baxter & Woodman, Inc. for construction-related engineering services.
 
The Mokena Village Board on Monday, September 8, 2025, moved forward with its annual infrastructure maintenance by awarding two key contracts for its Fiscal Year 2026 Street Improvements program.
The first contract, for $113,731.06, was awarded to Denler, Inc. of Joliet for the village’s High Density Mineral Bond (HA5) Program. Public Works Director Dan Peloquin explained that the HA5 asphalt sealant is a protective pavement surface application designed to extend the life and quality of roadways. This year’s program will cover approximately 18,134 square yards of roadway and parking lot areas, including the parking lot of the new police station. The cost of adding the police station lot will be offset by savings from the FY 2026 Roads project budget.
The board also authorized a professional engineering services agreement with Baxter & Woodman, Inc. for an amount not to exceed $178,365. The firm will provide construction-related services, including project management, site supervision, and material testing, for the FY 2026 Street Improvements Project, which was awarded on August 25. Peloquin noted the cost represents about 5.5% of the total construction contract, consistent with past projects. The services will be provided locally from Baxter & Woodman’s Mokena office.
Both contracts were unanimously approved by the board.
Latest News Stories
 Renovations at Veterans Assistance Commission and Court Annex on Track for Winter Completion
 Will County Considers First Update to Wastewater Ordinance Since 2016
 IDOT Plans to Invest Over $1.3 Billion in Will County Roads Through 2031
 Everyday Economics: Data blackout: Why the growth narrative doesn’t hold up
 Appeals Court rejects Trump administration bid to lift TRO in Illinois
 Those doxxing, threatening ICE agents, arrested, indicted
 ‘The Art of the Heal’: How TrumpRx, most-favored nation pricing, Big Pharma intersect
 GOP stands up for U.S. military strikes on suspected drug boats
 IL lawmakers could address energy prices, transit, taxes during veto session
 Committee Advances 50% Increase in Mental Health Levy on 4-3 Vote
 Will County Poised to Launch Major Mental Health Initiative Based on Joliet Program’s Success
 Looming State Energy Bill Threatens to Further Limit County Control Over Solar and Wind Projects
 Controversial Immigrant Rights Resolution Postponed by Will County Board After Heated Debate
 Trump says US troops will get paid Oct. 15 despite funding lapse