Will County P&Z Logo Planning Zoning.2

Committee Grants Lenox Solar Farm Project Six-Month Variance Extension

Spread the love

Will County Planning and Zoning Commission Meeting | November 18, 2025

Article Summary:
The Will County Planning and Zoning Commission has approved a 180-day extension for variances tied to a commercial solar energy facility in New Lenox Township. The extension provides the developer, Greenpath New Lenox LandCo LLC, with the necessary time to prepare the site for planting pollinator-friendly ground cover in the spring of 2026.

Solar Farm Variance Extension Key Points:

  • Location: Vacant property on South Spencer Road, New Lenox Township.

  • Project: A 4.95-megawatt commercial solar energy facility.

  • Variances Extended: Four variances related to increasing ground cover height to 36 inches and reducing required mowings from five times to one time per year.

  • New Expiration Date: The variances will now expire on August 16, 2026.

JOLIET, IL – A commercial solar energy project planned for New Lenox Township received a procedural green light on Tuesday, November 18, 2025, as the Will County Planning and Zoning Commission granted a six-month extension for its previously approved zoning variances.

The applicant, Greenpath New Lenox LandCo LLC, requested the 180-day extension to prevent the variances from expiring on February 18, 2026. According to a staff memo, favorable planting conditions for the pollinator-friendly ground cover planned for the site are not expected until after that date. The extension was the first of two possible 180-day extensions allowed by the ordinance.

The commission originally approved the variances in February 2025. They allow the developer to increase the maximum height of ground cover plants from 13 inches to 36 inches and reduce the number of required mowings from five times per year to just once. These changes are designed to support the establishment of a native pollinator habitat on the site, a practice encouraged by the Illinois Pollinator-Friendly Solar Site Act.

The project involves two parcels on South Spencer Road and is planned as a 4.95 MWac commercial solar energy facility. With the unanimous approval of the extension, the variances will now remain valid until August 16, 2026, allowing the developer to proceed with site preparation and planting in the spring.

Leave a Comment





Latest News Stories

Democratic PACs being investigated for bankrolling AWOL Texas House Democrats

Democratic PACs being investigated for bankrolling AWOL Texas House Democrats

By Bethany Blankley | The Center Square contributorThe Center Square (The Center Square) – Democratic political action committees are being investigated by state, and potentially federal, authorities over claims they...
Pritzker: Chicago mayor 'never once called' to oppose pension bill

Pritzker: Chicago mayor ‘never once called’ to oppose pension bill

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Illinois Gov. J.B. Pritzker says Chicago Mayor Brandon Johnson never called him to oppose a pension bill...
WATCH: Illinois In Focus Daily | Thursday Aug. 7th, 2025

WATCH: Illinois In Focus Daily | Thursday Aug. 7th, 2025

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop continues his coverage...
Illinois quick hits: Cook County declares flood disaster; opt-out forms promoted; State Fair begins

Illinois quick hits: Cook County declares flood disaster; opt-out forms promoted; State Fair begins

By Jim Talamonti | The Center SquareThe Center Square Cook County, Chicago declare flood disaster Chicago Mayor Brandon Johnson and Cook County Board President Toni Preckwinkle have issued respective disaster...
WATCH: IL Republican pushes for TX quorum rules that Pritzker hails as ‘hero’ move

WATCH: IL Republican pushes for TX quorum rules that Pritzker hails as ‘hero’ move

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – While Gov. J.B. Pritzker jokes on national TV that Illinois’ congressional maps were drawn by kindergartners, a...
mokena school district 159.5

Mokena School District Terminates Contract with Evans and Sons Blacktop Over Project Deficiencies

MOKENA, Ill. – The Mokena School District 159 Board of Education voted unanimously Wednesday to terminate its contract with Evans and Sons Blacktop for the playground and parking lot improvements...
Mokena Intermediate School

Mokena District 159 Highlights Strategic Progress, Sets Sights on Advanced Learning and Data Systems

MOKENA, Ill. – Mokena School District 159 administrators presented their annual Strategic Plan review to the Board of Education on Wednesday, showcasing a year of significant progress in curriculum, facility...
mokena-jr-high-school

District 159 Approves $173,700 Window Shade Replacement Project for Summer 2026

MOKENA, Ill. – The Mokena School District 159 Board of Education has authorized the district to seek proposals for a large-scale window shade replacement project at three schools, slated for...
mokena-elementary-school

Mokena Junior High to Get New Hot Water Heaters After Failures

MOKENA, Ill. – The Mokena School District 159 board has approved an emergency expenditure of up to $34,500 to replace two failing hot water heaters at Mokena Junior High School....
mokena school district 159.5

District 159 Board Gets First Look at FY26 Budget Draft, Education Fund Deficit Noted

MOKENA, Ill. – The Mokena School District 159 Board of Education received its first look at the fiscal year 2026 budget this week, kicking off a two-month process of review...
Meeting-Briefs

Meeting Summary: Mokena School District 159 Board for July 16, 2025

The Mokena School District 159 Board of Education took several significant actions at its July 16 meeting, including terminating a contract for summer construction work due to performance issues and...
Meeting-Briefs

Meeting Summary and Briefs: Frankfort Township Board for June 9, 2025

The Frankfort Township Board on Monday, June 9, 2025, approved its primary financial documents for the upcoming fiscal year, passing separate and balanced budget appropriation ordinances for the township and...
Sanchez

Sanchez Family Unveils Major Redevelopment Plan for Monee Industrial Property

Article Summary: Developer Luis Sanchez, a key figure in Monee's commercial growth for two decades, presented a plan to revitalize an industrial property on Industrial Drive. The project, which includes...
Screenshot-2025-08-13-at-2.15.28-PM

Monee Approves Over $566,000 Payment for New Public Works Facility Nearing Completion

Article Summary: The Monee Village Board approved a payment of $566,134.16 for the ongoing construction of its new Public Works building. Officials reported the project is on track for a...
Screenshot-2025-08-13-at-2.11.44-PM

Sheepdog Firearms Gets Green Light for Special Use Permit in Monee

Article Summary: Sheepdog Firearms received final approval from the Monee Village Board for a special use permit to operate a retail and firearms range facility at 25812 S. Sunset Drive....