WCO-Landfill-8.5.25.1

Will County Receives Detailed Update on Landfill Expansion Investigation

Spread the love

Article Summary:

The Will County Landfill Committee received a comprehensive technical update on the site investigation for the planned horizontal expansion of the county landfill, confirming the project remains on schedule. Consultants presented detailed findings from the completed geological and hydrogeological fieldwork, which will inform the final engineering and design of the new landfill area to ensure public and environmental safety.

Landfill Expansion Key Points:

  • Drilling of nine new borings and continuous soil and bedrock sampling for the expansion area is complete, with samples being sent for extensive laboratory analysis.

  • Fourteen new piezometers, or monitoring wells, have been installed to characterize groundwater conditions and will be used for an impact evaluation model.

  • Engineers are refining the expansion’s design, including adjusting the northern boundary to maximize airspace and designing a V-notched base for efficient leachate collection.

  • Despite the fieldwork phase taking slightly longer than anticipated, project consultants confirmed the overall expansion timeline has not been delayed.

The Will County Landfill Committee on Thursday received a detailed update on the extensive site investigation for the planned expansion of the county landfill, learning that the project remains on schedule as engineers begin analyzing a trove of geological data.

A consultant for the project, Mr. Fallon, walked committee members through the now-completed fieldwork phase, which involved drilling nine borings as deep as 140 feet to characterize the soil, clay, and bedrock at the proposed expansion site. He explained that the purpose of the in-depth investigation is to provide engineers with the necessary data to design a site that protects public health, safety, and welfare.

“We have logged and continuously sampled nine additional borings to supplement that information at the existing facility,” Fallon stated. “Those samples have all been delivered to the lab. And actually… we have already received back I would say about 75% of those analytical results.”

The investigation included collecting undisturbed soil samples using Shelby tubes and rock cores to conduct a battery of laboratory tests. These tests, Fallon explained, measure properties like soil density, moisture content, permeability, and shear strength. The results are critical for engineering calculations that ensure the stability of the landfill’s slopes and foundation.

In addition to soil stability, the investigation is focused on groundwater. Fourteen new piezometers—small-diameter wells—have been installed at various depths to monitor different water-bearing zones. This data will be used to create a groundwater impact evaluation model.

“We’ll take the landfill design once it’s once our engineers have developed that and then we’ll… place it into the into the geologic system,” Fallon said in response to a question from member Dawn Bullock. “And then we’ll assume that it’s leaking and we’ll evaluate… after 100 years after closure what are the what are the concentrations of this hypothetical plume at the zone of attenuation.”

Fallon noted that this modeling is a state requirement for the sighting application.

The data is already informing design tweaks. Stormwater modeling has shown that the planned retention ponds are larger than necessary, allowing engineers to push the landfill’s northern boundary slightly to “eek out a little more airspace.” They are also designing the base grades with a “V-notch design” to better channel leachate to a sump location for extraction.

County Board Speaker Joe VanDuyne asked if the water from the underlying aquifer could be utilized by the county. Fallon explained that this would be out of the question, citing both the unsuitability of the small monitoring wells for water supply and a deed restriction on the property. “We have a deed restriction we’re not allowed to use any of the water for drinking purposes,” he said.

Vice-Chair Kelly Hickey, who chaired the meeting, asked if there were any changes to the project’s timeline.

“We haven’t had a delay in the project yet,” Fallon responded. “The field investigation did take a little longer than we than we had thought it would… but within the larger framework of the project, I feel like we’re still on schedule.”

Events

No events

Leave a Comment





Latest News Stories

solar panels photovoltaics in solar farm

“Federal Policy Uncertainty” Blamed for Delay of Peotone Solar Farm; County Grants Second Extension

Article Summary: The Will County Board has granted a second permit extension for a solar farm in Peotone Township after the developer, Trajectory Energy Partners, cited "ongoing uncertainty regarding federal...
solar panels photovoltaics in solar farm

Will County Grants Extensions to Five Solar Projects Sold to New Developers

Article Summary: The Will County Board approved first-time permit extensions for five commercial solar projects across Monee, Crete, and Joliet townships, all of which were recently sold to larger energy...
WCO 2025-09-27 at 9.04.10 AM

Will County Board Approves Controversial Drug Recovery Retreat in Crete Township

Article Summary: The Will County Board has approved a special use permit for The Second Story Foundation to operate a long-term residential recovery program for men on a 68-acre horse...
Meeting Briefs

Meeting Summary and Briefs: Mokena Village Board for September 15, 2025

Mokena Village Board Meeting | September 15, 2025 The Mokena Village Board held a special meeting on Monday, September 15, 2025, where its primary action was the unanimous approval of...
Mokena Logo Graphic.5

Mokena Board Approves Final Plat for 50-Home Boulder Ridge Phase IV Subdivision

Mokena Village Board Meeting | September 15, 2025 Article Summary: The Mokena Village Board approved the final plat for the 50-lot fourth phase of the Boulder Ridge subdivision, clearing the way...
Meeting Briefs

Meeting Summary and Briefs: Mokena Village Board for September 8, 2025

Mokena Village Board Meeting | September 8, 2025 The Mokena Village Board on Monday, September 8, 2025, unanimously approved a major overhaul of its police ticketing system, raising fines for...
Mokena Logo Graphic.5

Mokena Board Greenlights Boulder Ridge Development Settlement

Mokena Village Board Meeting | September 8, 2025 Article Summary: The Mokena Village Board has approved a settlement agreement involving the developer of the Boulder Ridge subdivision, resolving outstanding issues and...
Mokena Logo Graphic.1

Mokena Appoints Jacob Hazek as New Village Arborist

Mokena Village Board Meeting | September 8, 2025 Article Summary: The Mokena Village Board has appointed Jacob Hazek to the position of Arborist within the Public Works Department. Hazek was selected...
Mokena Logo Graphic.2

Mokena Awards Nearly $300,000 in Contracts for Road Maintenance and Project Oversight

Mokena Village Board Meeting | September 8, 2025 Article Summary: The Mokena Village Board approved two contracts totaling over $292,000 for its Fiscal Year 2026 street improvement and maintenance programs. The...
Mokena Logo Graphic.6

Mokena Board Approves Sweeping Increases to Police Ticket Fines

Mokena Village Board Meeting | September 8, 2025 Article Summary: The Mokena Village Board unanimously approved a new ordinance that significantly increases fines for a wide range of non-traffic municipal code...
'Glaring failure:' lawmaker accuses Meta of failing to make AI chatbots kid-safe

‘Glaring failure:’ lawmaker accuses Meta of failing to make AI chatbots kid-safe

By Thérèse BoudreauxThe Center Square A U.S. lawmaker is once again demanding that Meta prevent minors from accessing its AI chatbots, citing the technology company’s “glaring failure to properly and...
Supreme Court allows ICE to factor race, workplace into L.A. raids

Supreme Court allows ICE to factor race, workplace into L.A. raids

By Morgan SweeneyThe Center Square The U.S. Supreme Court ruled Monday to temporarily allow U.S. Immigration and Customs Enforcement officers to use race, native language and place of work to...
Op-Ed: Illinois just cemented its place as a 'Legislative Inferno'

Op-Ed: Illinois just cemented its place as a ‘Legislative Inferno’

By Zach MottiThe Center Square Illinois already has a reputation for having one of the most hostile civil legal climates in America. On August 15, 2025, Governor JB Pritzker signed...
WATCH: DHS launches ICE 'Midway Blitz' in Chicago as Trump calls out cashless bail

WATCH: DHS launches ICE ‘Midway Blitz’ in Chicago as Trump calls out cashless bail

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – As the U.S. Department of Homeland Security announces a new operation in Chicago, President Donald Trump says...
Pritzker signs behavioral health data law amid privacy concerns

Pritzker signs behavioral health data law amid privacy concerns

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – An Illinois state senator says the state’s track record with data security raises concerns about a...