WCO-Landfill-8.5.25.1

Will County Receives Detailed Update on Landfill Expansion Investigation

Spread the love

Article Summary:

The Will County Landfill Committee received a comprehensive technical update on the site investigation for the planned horizontal expansion of the county landfill, confirming the project remains on schedule. Consultants presented detailed findings from the completed geological and hydrogeological fieldwork, which will inform the final engineering and design of the new landfill area to ensure public and environmental safety.

Landfill Expansion Key Points:

  • Drilling of nine new borings and continuous soil and bedrock sampling for the expansion area is complete, with samples being sent for extensive laboratory analysis.

  • Fourteen new piezometers, or monitoring wells, have been installed to characterize groundwater conditions and will be used for an impact evaluation model.

  • Engineers are refining the expansion’s design, including adjusting the northern boundary to maximize airspace and designing a V-notched base for efficient leachate collection.

  • Despite the fieldwork phase taking slightly longer than anticipated, project consultants confirmed the overall expansion timeline has not been delayed.

The Will County Landfill Committee on Thursday received a detailed update on the extensive site investigation for the planned expansion of the county landfill, learning that the project remains on schedule as engineers begin analyzing a trove of geological data.

A consultant for the project, Mr. Fallon, walked committee members through the now-completed fieldwork phase, which involved drilling nine borings as deep as 140 feet to characterize the soil, clay, and bedrock at the proposed expansion site. He explained that the purpose of the in-depth investigation is to provide engineers with the necessary data to design a site that protects public health, safety, and welfare.

“We have logged and continuously sampled nine additional borings to supplement that information at the existing facility,” Fallon stated. “Those samples have all been delivered to the lab. And actually… we have already received back I would say about 75% of those analytical results.”

The investigation included collecting undisturbed soil samples using Shelby tubes and rock cores to conduct a battery of laboratory tests. These tests, Fallon explained, measure properties like soil density, moisture content, permeability, and shear strength. The results are critical for engineering calculations that ensure the stability of the landfill’s slopes and foundation.

In addition to soil stability, the investigation is focused on groundwater. Fourteen new piezometers—small-diameter wells—have been installed at various depths to monitor different water-bearing zones. This data will be used to create a groundwater impact evaluation model.

“We’ll take the landfill design once it’s once our engineers have developed that and then we’ll… place it into the into the geologic system,” Fallon said in response to a question from member Dawn Bullock. “And then we’ll assume that it’s leaking and we’ll evaluate… after 100 years after closure what are the what are the concentrations of this hypothetical plume at the zone of attenuation.”

Fallon noted that this modeling is a state requirement for the sighting application.

The data is already informing design tweaks. Stormwater modeling has shown that the planned retention ponds are larger than necessary, allowing engineers to push the landfill’s northern boundary slightly to “eek out a little more airspace.” They are also designing the base grades with a “V-notch design” to better channel leachate to a sump location for extraction.

County Board Speaker Joe VanDuyne asked if the water from the underlying aquifer could be utilized by the county. Fallon explained that this would be out of the question, citing both the unsuitability of the small monitoring wells for water supply and a deed restriction on the property. “We have a deed restriction we’re not allowed to use any of the water for drinking purposes,” he said.

Vice-Chair Kelly Hickey, who chaired the meeting, asked if there were any changes to the project’s timeline.

“We haven’t had a delay in the project yet,” Fallon responded. “The field investigation did take a little longer than we than we had thought it would… but within the larger framework of the project, I feel like we’re still on schedule.”

Events

No events

Leave a Comment





Latest News Stories

WATCH: Pritzker welcomes FBI looking for TX Dems in IL, dismisses bribery question

WATCH: Pritzker welcomes FBI looking for TX Dems in IL, dismisses bribery question

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – As the FBI gets involved in locating Texas Democrats hiding out in states like Illinois, Gov. J.B....
WATCH: Illinois State Fair: Affordable fun backed by $140M in taxpayer funding

WATCH: Illinois State Fair: Affordable fun backed by $140M in taxpayer funding

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – The 2025 Illinois State Fair is being praised for its affordability and accessibility to families across...
Op-Ed: State lawmakers gut Emmett Till Day bill, expose Illinois’ corruption problem

Op-Ed: State lawmakers gut Emmett Till Day bill, expose Illinois’ corruption problem

By LyLena D. Estabine | Illinois Policy InstituteThe Center Square July 25, 2025, would have marked Illinois’ first Emmett Till Day, a commemoration of the 14-year-old Chicagoan whose 1955 lynching...
Democratic PACs being investigated for bankrolling AWOL Texas House Democrats

Democratic PACs being investigated for bankrolling AWOL Texas House Democrats

By Bethany Blankley | The Center Square contributorThe Center Square (The Center Square) – Democratic political action committees are being investigated by state, and potentially federal, authorities over claims they...
Pritzker: Chicago mayor 'never once called' to oppose pension bill

Pritzker: Chicago mayor ‘never once called’ to oppose pension bill

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Illinois Gov. J.B. Pritzker says Chicago Mayor Brandon Johnson never called him to oppose a pension bill...
WATCH: Illinois In Focus Daily | Thursday Aug. 7th, 2025

WATCH: Illinois In Focus Daily | Thursday Aug. 7th, 2025

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop continues his coverage...
Illinois quick hits: Cook County declares flood disaster; opt-out forms promoted; State Fair begins

Illinois quick hits: Cook County declares flood disaster; opt-out forms promoted; State Fair begins

By Jim Talamonti | The Center SquareThe Center Square Cook County, Chicago declare flood disaster Chicago Mayor Brandon Johnson and Cook County Board President Toni Preckwinkle have issued respective disaster...
WATCH: IL Republican pushes for TX quorum rules that Pritzker hails as ‘hero’ move

WATCH: IL Republican pushes for TX quorum rules that Pritzker hails as ‘hero’ move

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – While Gov. J.B. Pritzker jokes on national TV that Illinois’ congressional maps were drawn by kindergartners, a...
mokena school district 159.5

Mokena School District Terminates Contract with Evans and Sons Blacktop Over Project Deficiencies

MOKENA, Ill. – The Mokena School District 159 Board of Education voted unanimously Wednesday to terminate its contract with Evans and Sons Blacktop for the playground and parking lot improvements...
Mokena Intermediate School

Mokena District 159 Highlights Strategic Progress, Sets Sights on Advanced Learning and Data Systems

MOKENA, Ill. – Mokena School District 159 administrators presented their annual Strategic Plan review to the Board of Education on Wednesday, showcasing a year of significant progress in curriculum, facility...
mokena-jr-high-school

District 159 Approves $173,700 Window Shade Replacement Project for Summer 2026

MOKENA, Ill. – The Mokena School District 159 Board of Education has authorized the district to seek proposals for a large-scale window shade replacement project at three schools, slated for...
mokena-elementary-school

Mokena Junior High to Get New Hot Water Heaters After Failures

MOKENA, Ill. – The Mokena School District 159 board has approved an emergency expenditure of up to $34,500 to replace two failing hot water heaters at Mokena Junior High School....
mokena school district 159.5

District 159 Board Gets First Look at FY26 Budget Draft, Education Fund Deficit Noted

MOKENA, Ill. – The Mokena School District 159 Board of Education received its first look at the fiscal year 2026 budget this week, kicking off a two-month process of review...
Meeting-Briefs

Meeting Summary: Mokena School District 159 Board for July 16, 2025

The Mokena School District 159 Board of Education took several significant actions at its July 16 meeting, including terminating a contract for summer construction work due to performance issues and...
Meeting-Briefs

Meeting Summary and Briefs: Frankfort Township Board for June 9, 2025

The Frankfort Township Board on Monday, June 9, 2025, approved its primary financial documents for the upcoming fiscal year, passing separate and balanced budget appropriation ordinances for the township and...